Others
Water use
The figure below shows that Brussels and JRC Ispra account for most of the water used. the Commission has reduced its total water consumption by 3% since 2022, and 32% since 2019. The reduction in water use is partly a by-product of some actions to reduce energy consumption, for example prolonged office closures when humidification of air is not required.
Water use at the EMAS sites, 2014-2023 (m3)
Water saving measures undertaken since 2015 include more proactive water management, installation of leak detection systems and loss prevention. Water saving devices (tap aerators) have been installed in most of the remaining buildings. Warmer temperatures during summer months may require more water for cooling and humidification.
Data from 2018-2022 were corrected to incorporate improperly excluded data due to very late invoicing or poor estimations. Data for 2023 includes estimations based on 2022 data as some invoices are not yet available (BECH and MERP bldgs), while in DRB there are several broken counters managed by the owner.
Water consumption shows significant reduction compared to 2019 values (-20%) and a justified increase after 2021 when returning to the office - new normal. The alternative, to record water consumption directly from water meters in order to have more reliable data, is not a feasible alternative due to the complexity of current real estate situation. The move to JMO2 will address this problem.
Measures to save drinking water include smart taps installed in most buildings while BECH and the new Mercier Post building have a rainwater collection system connected to sanitary infrastructure for flushing toilets etc.
- JRC Geel increased its water consumption by around 12 % in 2023 compared to 2022 due to technical issues and Mol fire brigade's request to connect to the JRC Geel hydrant to extinguish a fire in the vicinity of the site.
- In JRC Ispra, the use of “drinking water” decreased by about 36% between 2014 and 2023 (-11% between 2022 and 2023). This was mainly due to the improved water management (installation of new water consumption metering devices) modifications due to misuse of drinking water for cooling purposes and to the identification and repair of various leaks in the network.
- In JRC Karlsruhe, a significant part of the water is used for the humidifying incoming air in the laboratory wings and the quantity depends on weather conditions. Cold and dry weather requires more humidification whereas other weather conditions may not require humidification at all.
- Weather conditions since autumn 2019 often did not require significant humidification, which might be a result of climate change. Floor space is the main indicator for water use, which is largely determined by technical requirements and scientific activities.
- At JRC Petten, the water usage decreased by 10% in 2023 compared to 2022. The water usage in Petten is dependent on the scientific activities on site.
- In JRC Seville, the water saving in 2023 can be partly attributed to a reduction in demand from the HVAC facility, which had its temperature set points adjusted to be more environmentally-friendly. Additionally, the building was not operational for approximately four days while major electrical infrastructure was replaced.
Drainage and wastewater disposal
The sites comprising offices in urban locations have regular drainage and connection to the municipal sewerage system. There are challenges for the more rural sites and particularly the research sites where some wastewaters are very strictly controlled.
Drainage and wastewater is managed within the urban collection and treatment facilities of the Brussels region.
DG ENER manages a radiation protection laboratory, requiring particular attention to wastewater disposal. But DG ENER did not discharge any wastewater in 2023. Otherwise, drainage and wastewater for the Luxembourg buildings is managed by the urban collection and treatment facilities of the Luxembourg region. The installation of a green roof in the new Mercier Post building improves water management and reduces flood risk.
- JRC Geel is legally required to monitor its wastewater for both quantity and quality. Samples are analysed twice per year to ensure that concentrations of special parameters (lead, etc.) do not exceed the legally defined thresholds. Potentially nuclear contaminated water is treated and disposed as hazardous waste. The update of the site's environmental license resulted in stricter thresholds for special parameters (for example, it is ten times lower for mercury).
- JRC Ispra wastewaters include discharges produced by flush toilets (both from the internal JRC area and the social areas outside the fence) and discharges produced by the canteens, laboratory sinks, etc. On top of this, the JRC Ispra's wastewater treatment plant receives part of the urban wastewater from the Municipality of Ispra (about 16% of the overall amount in 2023). The treatment process includes a primary sedimentation phase followed by biological biodisc, secondary sedimentation and treatment by Ultra Violet (UV) rays. Treated wastewater is monitored to ensure compliance with the Italian threshold limits for water quality (during 2023 all the parameters are well below the Italian threshold limits and is finally discharged in the Novellino stream (about 3,2 million cubic meters in 2023). A secondary sewer discharging system only collects rainwater and soil drainage and conveys it to the Acquanegra stream, without the need for any preventive treatment processes.
- In JRC Karlsruhe, all wastewater is treated in the wastewater treatment plant belonging to the KIT Campus Nord before release to the public system.
- In JRC Petten, wastewater discharge and quality is measured yearly during a week determined by the authorities and during which the discharge volume is measured along with concentration of heavy metals, organic solvents and chlorides. The data collected is used as a basis for taxation. For monitoring purposes, the site carries out two separate sampling campaigns a year at four emission points, each located in different laboratories. The results give an indication of whether concentrations comply with legal limits for end of pipe discharge for the site. JRC Petten discharges comply with the legal discharge limits.
- JRC Seville is hosted in a rented office building in an urban area. The wastewater installation is managed by the landlord in accordance with local legislation.
Until 2010 the site had its own sewage treatment plant, but due to technical issues it was decided to connect to the local sewage scheme.
Discharges to water: Polluted discharges to ground and surface water are prevented by primary and secondary containment of all hazardous wastes and materials and substances on site. Discharges to sewer are from sanitary and cooking facilities. The kitchen sinks drain through a grease trap which is regularly serviced and emptied. Cleaning chemicals are low or non-hazardous and are diluted when applied.
Paper consumption
The Commission measures the consumption of paper in the office, and also in the printshops. Currently printshops are present only in Brussels, Luxembourg, Seville and Ispra. total paper consumption has reduced considerably as shown below as a result of campaigns over the years including the introduction of digital signature circuits, the removal of individual printers, the ability to work together on electronic documents.
A new digital strategy was launched in 2022. Mass printing of poster scale calendars has reduced and circulation of paper publicity materials is almost phased out. A slight decrease in both total and printshop paper consumption was observed in 2023, as shown below. Office paper consumption was slightly increased in 2023 to 5 sheets/person/day, Emissions due to paper consumption are presented in figure Emissions from total paper consumption.
Evolution of total paper consumption (tonnes)
Office paper consumption (sheets/person/day)
Emissions from total paper consumption (tonnes CO2e)
EMAS system costs
As shown below the EMAS coordination team has, for several years, monitored the cost of implementing EMAS in terms of staff time and the costs of related contracts for example for audits, and expertise.
The overall cost for the Commission has usually fluctuated between 67 and 91 EUR per staff member since the calculations were initiated. The cost is higher at smaller sites and very low in Brussels, where most staff are based.
EMAS system costs (staff and contracts)
Energy costs
Under EMAS the cost of energy, water, and waste disposal have been monitored at all the sites. Energy is by far the most expensive on a per capita basis. Total buildings' energy costs almost doubled in 2022 following Russia's illegal invasion of Ukraine, and they remained high in 2023, despite a small decrease as shown below.
Resource costs (energy) at EMAS sites (EUR; EUR/person)
Promoting a healthy and sustainable food system

The Commission will study and implement actions to further reduce or remove single-use items, particularly from catering, meetings and conferences. More generally, it will update its internal approach to food and catering, through embedding GPP criteria such as labels certifying sustainable food for the canteens.
The Covid pandemic severely disrupted catering services, with many restaurants and cafeterias closing. In 2023 the rebound in catering activity since Covid continued. This is reflected in the table below which shows the quantities of 14 food types consumed at Commission sites' canteens since 2019. New categories (lamb, veal, fruits, vegetables, bread, pasta and rice) were introduced for reporting this year to have a more complete picture. Although 2023 saw a recovery, total consumption remained less than half the 2019 value. One reason for this is the reduction of the number of canteens after the Covid crises and the new ways of working.
Annual consumption of selected food groups in Commission cafeterias (tonnes)
| Food item | Factor kg CO2e/t | 2019 | 2020 | 2021 | 2022 | 2023 |
|---|---|---|---|---|---|---|
| i) Beef | 33 770 | 82 | 24 | 4,1 | 21 | 25 |
| ii) Pork | 9 350 | 104 | 30 | 8,7 | 29 | 32 |
| iii) Chicken | 4 470 | 134 | 37 | 10 | 35 | 33 |
| iv) Fish | 10 970 | 90 | 27 | 11 | 26 | 41 |
| v) Milk | 1 490 | 75 | 25 | 10 | 26 | 85 |
| vi) Other dairy* | 8 960 | 37 | 12 | 8,8 | 20 | 58 |
| vii) Coffee | 9 400 | 19 | 8,7 | 8,6 | 6,6 | 21 |
| viii) Lamb | 40 204 | 15 | 16 | 4,1 | 5,6 | 36,5 |
| ix) Veal | 17 092 | 123 | 70 | 21 | 19 | 61 |
| x) Fruits | 589 | 32 | 30 | 8,7 | 8,8 | 19 |
| xi) Vegetables | 846 | 82 | 71 | 21 | 26 | 95 |
| xii) Bread | 689 | 11 | 8,2 | 3,1 | 3,5 | 8,7 |
| xiii) Pasta | 2 145 | 31 | 28 | 5,4 | 14 | 29 |
| xiv) Rice | 2 754 | 14 | 12 | 3,7 | 5,7 | 14 |
| Total | 848 | 399 | 128 | 245 | 558 |
Notes:* Average of yoghurt/butter
The data shows that lamb and beef are the most carbon intensive food group and the proportion of both in the total has decreased from 11% in 2019 to 7% in 2023. The emissions generated by these food groups is illustrated below. Data is not reported for sites lacking a dedicated canteen (JRCs Petten, Karlsruhe, Seville).
Annual emissions of seven food groups (tonnes CO2e)
The current focus is to redevelop the cantine service with a new post pandemic delivery model. Improvements continue towards delivering a more sustainable service in the spirit of Brussels Capital Region's 'Good Food' label.
Given the quantities requested, the supply of organic or short circuit produce cannot be guaranteed within the framework of current supply contracts.
Restaurant management aims to minimise the production of food waste for example, vegetable scraps are reused for soups or to produce chips for cafeterias. Friday dishes are designed at the last minute to empty the fridges. So environmental management of kitchens remains an OIB priority.
In Luxembourg, all canteens already hold the SuperDrecksKëscht fir Betriber.
In 2023, OIL catering continued its participation in ECOBOX, a multi purpose deposit-return scheme developed in Luxembourg for transporting meals (take-away, leftovers, etc.). This initiative reduces waste volume, by reducing not only the number of packages but also the quantity of food waste.
GPP criteria were included (packaging, end-of-life recyclability and energy consumption) in the new call for tender for vending machines.
The new contract for procurement (dynamic purchasing system), fosters the purchase of locally produced foodstuff to be used for catering in Luxembourg.
Sustainable catering services have been offered at the JRC for a couple of years, when appropriate (in Ispra, the canteen is managed by the OIB and there is no canteen in Seville). For the sites without a canteen/cafeteria, efforts are mostly made for organised events.
JRC Geel’s catering contract includes measures for a fair, healthy and sustainable food system. For instance, the caterer has a “biogarantie” certificate for a significant proportion of the products used, that should also be seasonal. JRC Geel proceeds with the sustainable food measures (water "fountains", glass bottes for beverages, provision of vegan, organic and fair trade desserts, 25% meat portion reduction, take-away available to reduce food waste, etc). It also continues with the supply of two dishes per day (vegetarian and either fish or meat) instead of three (before Covid-19). The CO2e emissions from the catering at JRC Geel significantly increased in 2023 due to higher staff attendance (up to 80 menus/day versus 50 in 2022).
In JRC Ispra, OIB manages social infrastructures for staff: children's facilities, temporary lodgings for EC staff, a Clubhouse, as well as two canteens, a cafeteria, a restaurant and the banqueting service for conferences and events. In 2017, the process of eliminating single use plastic and single-dose food started. Water dispensers were installed and water jugs provided to customers free of charge. In 2018, plastic was banned from take-aways and coffee breaks, containers and cutlery were replaced with compostable, biodegradable alternatives or reusable tableware where feasible. To reduce the impact of the whole catering services, there were some changes in the service set-up. At the same time, more plant-based meals was introduced to the canteens: in 2023 more than 40% of the daily food served at the canteens did not contain any meat.
JRC Karlsruhe operates a small cafeteria on its premises, but mainly uses the restaurant facilities of the surrounding research campus (KIT Campus Nord) whose catering practices it cannot influence directly.
Services at the JRC Petten's restaurant are provided by the catering company Vitam. It partners with MVO NETHERLANDS, a Dutch initiative promoting service providers' awareness on the impact of the catering business on people and the environment, the use of seasonal foods from sustainable origin, less meat, more vegetables, use of local producers for zero or almost zero kilometres products.
In JRC Seville, when setting up a catering service for events, service providers are systematically asked to include a declaration or statement on the sustainability of their services (“Greening contracts – JRC”)
The contractor is yet to provide the 2023 figures for food consumption. In 2022 the contractor, for IT reasons, also provided no data, so consumption was therefore estimated reproportioning the 2019 food consumption according to the staff's average monthly site presence on site in 2022 (24%).
Legal compliance
Under EMAS, the sites are each responsible for legal compliance, as described below. But the Corporate coordination team organises the internal and external audits that are required at the sites under EMAS including ensuring that there is adequate follow up and resolution of audit findings, particularly those related to legal compliance. The audit results show that the Commission complies with the environmental legislation applicable to its activities.
The status of legal compliance is reported to the EMAS Steering Committee twice yearly, including statistics generated by the workflow tool (JIRA) that is used for audit follow up. Figure Audit findings by type for 2020-3 shows a summary of audit findings.
Audit findings by type for 2020-3
The Commission adopts a sampling method for the verification audits of its premises in Brussels, Luxembourg, and for the Houses of Europe in Member States according to provisions of the EMAS Users Guide. Sampling is required at these sites because each building has its own environmental permit and are too many to audit annually.
The Commission has around 70 operational buildings in Brussels and Luxembourg. These are controlled and managed centrally by the Infrastructure Offices in Brussels (OIB) and Luxembourg (OIL) which ensure their compliance with environmental legislation and contacts with the national and regional authorities. The Offices manage the licences and permits needed for building operation. The Commission's real estate portfolio varies from year to year. The buildings are listed in Annex 9.
The environmental impacts of these buildings are generally similar and with no highly impacting environmental aspect requiring a specific approach. Therefore, all the buildings are subject to the sampling method for auditing.
The Commission uses sampling to select 5 to 6 buildings per year (also listed in Annex 9), more than required in the User’s Guide, to provide greater confidence in audit results. The sampling method ensures that each building entering in the scope is audited and that all buildings are audited in the same period. The audit sample is discussed and agreed with the verifier each year. In addition to audits carried out under the sampling method, additional visits (or audits) may be planned to buildings where a non-conformity was detected to verify.
In Brussels, each building has a licence called "permis d’environnement" containing the environmental legislation applicable to the building, including specificities when appropriate. In addition, general environmental legislation like the COBRACE are also implemented.
Several units within the OIB are registered users of the Regulation Monitoring contract REMO, launched by the European Parliament, for legislation relating to EMAS, technical equipment and persons with reduced mobility. This monitors new regulations, and enables the OIB (through emails and links to designated users) to be up-to-date on relevant legislation. The EMAS team at OIB performs an analysis of the new legislation and highlights its potential impacts, suggesting the course of action necessary to guarantee compliance.
As a consequence, the Brussels site complies with the relevant environmental legislation.
- Environmental Permits and legal watch:
In OIL, two procedures are used to follow the environmental requirements.
- a) "OIL Bâtiments 04 Documentation OIL des authorisations d’exploitation des bâtiments – version 2023” which describes how OIL manages operating permits for its classified facilities (commodo/incommodo). The objective is to provide a central register of operating permits for buildings occupied by the European Commission in Luxembourg, and to meet their environmental requirements.
- b) "Procédure OIL EMAS 01: Veille Réglementaire environnementale – version 2023” in order to ensure that the property management complies with the environmental legislation, thanks to the integration of new environmental legal provisions.
The regulatory monitoring in the field of the environment and health and safety at work for the European Commission in Luxembourg is currently carried out under framework contract HR/2023/LVP/0113 with Luxcontrol S.A. (valid until 25/05/2027). Every month the contractor sends OIL any useful environmental information and/or published legislation. Information pertaining to environmental legislation is regularly scrutinised on the various official sources available in Luxembourg.
-
Luxembourg mini audit procedure:
The procedure “OIL EMAS 05 “Documentation of mini internal audit of OIL regulatory compliance”- version 2022 initiated by OIL, describes how OIL manages additional internal audits of regulatory compliance, set up following documentary analysis of operating permits and recurring non-compliances. The procedure provides a register of operating permits for the Commission's buildings in order to ensure the legal compliance. In 2022 Laccolith and Ariane buildings were audited. In 2023, Bech and Mercier-Post buildings were audited.
Therefore the Luxembourg site complies with the relevant environmental legislation.
- JRC Geel is a class 1 nuclear facility subject to strict legislation from the federal (Federal Agency for Nuclear Control - FANC) and Flemish (Openbare Afvalstoffen Maatschappij - OVAM; Vlaamse Milieu Maatschappij - VMM) authorities. In order to operate, JRC Geel is registered with both a nuclear and an environmental license defining the legal framework of its activities. To comply with the legal requirements and be able to follow up the changes and updates of the legislation, the site has implemented a nuclear registry (PHARIUS) as well as an environmental registry (ARCALEX) managed by the Health and Physics service (HPS) and the EMAS Site Coordinator respectively. Each registry contains the legal requirements for the relevant activities of the site and is regularly updated. The environmental legal compliance is managed by the procedure IMS-GEE-S6.6-PRO-0007 Management of Environmental Legal Compliance JRC-Geel. Changes in legislation are communicated to the different stakeholders (staff, contractors, etc.) before their implementation. Environmental control measures are implemented to assess and ensure that the JRC Geel site complies with the legislation through inspections and internal and external audits.
- According to the Site Agreement, Italian Law 906/1960, JRC Ispra is fully implementing the Italian legislation regarding nuclear prescriptions and is applying under a voluntary basis (and under its own responsibility) environmental prescriptions to its other activities. JRC Ispra has developed a dedicated strategy to issue internal environmental authorisations that are technically equivalent to those issued by Italian Authorities (e.g., water treatment plant, trigeneration plant, geothermal wells with groundwater withdraw). This approach has been shared with the Italian EMAS Competent Body. The site maintains a transparent official communication with all relevant stakeholders, for example regarding tri-generation emissions’ threshold values, which was ensured by means of the overall emission in terms of mass flow for CO and NOx, assuming the continuous operation of the plant for the entire year. Several actions were carried out to limit the trigeneration plant emissions and the replacement of the existing trigeneration plant with a new one is foreseen for the end of 2024. Several tools are currently in place to ensure appropriate legal compliance; checks are performed continuously throughout the Ispra site. The EMAS team on site performs an annual analysis of the new legislations and highlights its potential impacts, suggesting the course of action necessary to guarantee compliance. In addition, in 2017, JRC Ispra signed a Convention with ARPA Lombardia for legal and technical support on environmental matters. As a consequence, JRC Ispra complies with the environmental legislation applicable to its activities.
- JRC Karlsruhe is a nuclear installation under the German legislation and as such is bound by a tight regulatory framework under the Atomic Energy Act (Atomgesetz, last updated in July 2018), the Radiation Protection Act (Strahlenschutzgesetz, last updated in December 2019) and the respective Radiation Protection Ordinance (Strahlenschutzverordnung, latest version December 2018). The nuclear licences and amendments governing JRC Karlsruhe’s operations are publicly available on the internet pages of the Ministerium für Umwelt, Klima und Energiewirtschaft Baden Württemberg (Ministry of the Environment, Climate Protection and Energy Sector). Applicable regulations are listed and assessed in the Legal Register IMS-KRU-S6.5-RGS-0007-DE, which was created in cooperation with an external company, who also provide an update twice a year (most recently in December 2022). In order to assess legal compliance, the site commissioned an external company to undertake legal compliance audits annually. The latest internal audit, encompassing legal compliance took place in November 2023. Due to this, and also due to the constant surveillance by the authorities, JRC Karlsruhe is compliant to all relevant legislations. There have been no legal proceedings against the site and consequently neither penalties nor fines since operations started.
- JRC Petten is complying with the dutch Activities Decree (Activiteitenbesluit) and the Activities Regulations (Activiteitenregeling) containing environmental regulations. The Activities Decree has different rules for different types of businesses and makes a distinction between companies of types A, B and C. JRC Petten is a type C business, requiring an All-in-one Permit for Physical Aspects. The Environmental Permit/License was obtained on 24 June 2016. The Compliance of the Permit is checked annually. The site has a contract with an external legal consultancy filtering the applicable legislation in an online tool. JRC Petten is compliant with the relevant environmental legislation.
- JRC Seville legal compliance is regularly checked against a legal register supplied by a specialist company. Based on this register, the activity of the JRC Seville is excluded from the obligation of obtaining an environmental permit according to the relevant regulation “Ordenanza Reguladora de Obras y Actividades del Ayuntamiento de Sevilla. Nevertheless, the Seville site is compliant with all the relevant environmental legislation such as the “Real Decreto 390/2021” about energy labelling for buildings or the “Ley 7/2022” on waste management.
- Through the above measures, the JRC sites comply with the environmental legislation.
As Grange operates as a simple office there are no specific licences/permits required (see more information at https://www.pointofsinglecontact.ie/licences-and-permits/)
A procedure for maintaining the legal register has been in place since late 2014. The Register of Environmental Legislation is reviewed and updated continually by an external consultancy. The responsible DG SANTE personnel receive automatic email updates relating to new or changing legislation and ensure that there is appropriate follow up.
As a consequence, the Grange site complies with the relevant environmental legislation.
Prevention and risk management
OIB records statistics relating to the findings of buildings inspections for health, safety and environment. These audits and inspections are based on permits and legal requirements for each building and technical installation.
Out of 1 481 reports issued in 2023, 614 (41%) had no remarks, while 512 (35%) stated minor and 355 (24%) major non-conformities
The procedure OIL.01 EMAS 04 “Accidents et incidents environnementaux” - version 2022 describes how the EC identifies potential emergency situations and accidents that may have one or more impacts on the environment and how to respond to them. The objective is to ensure that the appropriate measures have been taken and investigate any possible negative impact on the environment.
OIL drafted “Instruction OIL SST 23 Vigilance et alerte météorologiques" concerning the risk of flooding (still under analysis).
- At JRC Geel, prevention and risk management is managed by the HPS. JRC Geel implements an Occupational Health & Safety Management System, which is certified according to ISO45001. In order to meet the legal requirement of a class 1 nuclear facility, the site has a voluntary fire brigade team for first intervention supported by the local fire brigade. The fire brigade team trains monthly on site and receives annual training in a professional firefighting centre. The site has preventive and risk management actions as well as a full maintenance and inspection plan to ensure that all critical installations/equipment function properly. To assess the legal compliance, nuclear and EMAS inspections take place regularly.
- In JRC Ispra, the emergency procedures were reviewed in 2018. The site's Emergency and Business Continuity Plan and associated procedures and instructions, providing the framework for both nuclear and conventional emergencies, including incidents that could have a negative impact on the environment (on and off site), were approved and finally issued in 2019. The procedure for the management of emergency exercises and the planning of emergency exercises and drills has been updated to account for all the applicable environmental scenarios, including spillage and release of dangerous substances and finally issued in 2021.
- In 2013, JRC Ispra detected the presence of fuel oil in the ground close to Via Esperia during one of its periodical checks. This was from a leak from two old underground storage tanks that had been used to store fuel oil for heating the residences within the JRC social area. The tanks and surrounding layers of the soil were removed. However, a minor presence of fuel oil was detected in the neighbouring areas both under Via Esperia, and in the premises of a JRC Ispra car park.
- The Italian authorities were informed about this legacy and regularly updated, including through the JRC Ispra EMAS Round Table meetings. Although JRC Ispra's risk analysis indicated that the residual presence of fuel oil was under the mandatory intervention threshold, the site opted for the best environmental approach and initiated the corresponding soil removal procedure in 2022, including supplying preliminary information to the competent authorities. At the end of 2023 the Municipality of Ispra called a Conferenza dei Servizi to approve the remediation plan.
- In JRC Karlsruhe, as an installation subject to German nuclear legislation, the entire site and its activities are conceived and operated with a focus on prevention, risk management and emergency preparedness. The applicable legislation requires these topics explicitly. Procedures are therefore based on and tailored to this legislation. Significant procedures have to be approved by the supervising authority (Ministry of the Environment, Climate Protection and Energy Sector of Baden-Württemberg) before becoming effective. The supervisor undertakes inspection visits regularly, usually monthly.
- JRC Petten applies risk-based management for safety and environmental aspects, work place assessments, general risk inventories and risk assessments for specific tasks.
- Since 2010, JRC Seville has not recorded any health, safety or environmental incidents. An external prevention service maintains an occupational safety and health (OHS) register.
The site implements a programme of environmental incident prevention based on its evaluation of environmental aspects and impacts, and on the identification of potential emergency conditions or abnormal incidents related to each aspect.
Emergency preparedness
Beyond the procedures and services in place at the European Commission concerning emergency preparedness and response related to health, safety and security incidents at work (24/7 helpdesk line 22222), the OIB monitors the application of the legislation on well-being at work, in particular the evaluation of risks and corrective measures with an impact on the environment. Summary data for 2023 includes:
- number of evacuation exercises: 47
- training and recycling SIN: 732
- training and recycling ECI: 207
- training and recycling STE: 366
Summary data for 2023 includes:
- 19 evacuation exercises were carried out on all buildings in Luxembourg.
- 38 sessions (20 theory + 18 practice) of EPI and ECI training for 317 (164 theory + 153 practice) participants.
- 9 sessions of fire prevention training for 62 participants.
- 6 sessions of first aid training for 60 participants.
- In JRC Geel, emergency preparedness and response is managed by HPS according to the procedure IMS-GEE-S6.5-MAN-0002 JRC-Geel Site Internal Emergency Plan and the JRC Geel incident response plan. As a class 1 nuclear facility, JRC Geel has, besides its fire brigade team, 24 hour on call teams (TIG and NIG: Technical and Nuclear Intervention Groups) who answer and act in case of alarms on potential incidents.
- In JRC Ispra in 2023, mandatory nuclear emergency exercises and building evacuation tests were carried out. Additionally, a drill for the scenarios of leakage of caustic soda during tank refilling was carried out in the yard of the Cogeneration plant (Building 59). In order to test the preparedness of the JRC and the Italian authorities to respond to nuclear emergencies, the annual nuclear full-scale emergency exercise was held in February 2023 in the presence of local and national authorities. In parallel, an emergency exercise was held to test the emergency preparedness in Area 40. There was a positive outcome of both exercises.
- In JRC Karlsruhe, some practical examples demonstrating the rigour with which legal compliance and emergency preparedness are addressed:
- All safety and security relevant equipment and installations are subject to stringent recurring check programs, which are also under the supervision of the commissioned experts of the supervising authority;
- The site operates its own semi-professional firefighting team and cooperates with the professional fire brigade of the surrounding research site (KIT);
- Firefighting and evacuation exercises are regularly carried out, partially in cooperation with the fire brigade of the KIT;
- Most technical works are subject to a working permit procedure;
- The admission to the site is strictly limited.
- In JRC Petten, the organisation's emergency plans were revised in 2022 based on 51 identified emergency scenarios. They are based on risk management methodologies and also cover environmental risks. In 2023, 10 Emergency Drill exercises took place in order to practice and test all elements of the emergency plans. Contacts with the local quick response team (QRT, formerly fire brigade, operated by the neighbour organisation NRG) have been established in order to identify environmental risks.
- In JRC Seville, the site has a specific emergency procedure describing the methodology used at local level to identify and respond to potential accidents and emergencies that could affect staff, facilities and the environment. A fire drill is organised every year.
The Emergency Plan was not updated in 2022, but a fire drill took place in March 2022.