Īrija-Dublina: Celtņi
Iarnród Éireann (IÉ) requires the services of a competent and experienced company to supply and install and commission three new cranes and to remove and dispose of the three existing cranes within the Bogie Shop, Inchicore, Dublin 8. The Bogie Shop at Inchicore overhauls and produces bogies for all the Irish Rail passenger fleets.
The successful contractor will be responsible for any transport or civil works which may be required prior to removing and installing the cranes, all final measurements will be the responsibility of the contractor.
Supply and Install:
• 2 x 50 tonne cranes.
50 tonne cranes need to be operated simultaneously (in tandem for loco lifts) with the same control and separately when tandem lifts are not taken place. Anti-collision sensors and digital load sensors to be included.
• 1 x 25 tonne crane.
Removal and disposal
• Three existing 40 tonne cranes.
Note: this competition has been cancelled and republished under RFT 186901.
Oficiālais nosaukums: Iarnród Eireann-Irish Rail
Nacionālais reģistrācijas numurs: IE 4812851 O
Pasta adrese: Connolly Station
Pilsēta: Dublin
NUTS kods IE
Valsts: IRL
Kontaktpersona: David Behan
Galvenā adrese: http://www.irishrail.ie
Elektroniski:
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=182514&B=ETENDERS_SIMPLE
Šajā lapā publicētā informācija ir tikai papildu informācijas avots, un tai nav juridiska spēka. Eiropas Savienības iestādes neatbild par tās saturu. Attiecīgo līguma paziņojumu oficiālās versijas ir tās, kas publicētas Eiropas Savienības Oficiālā Vēstneša papildinājumā un pieejamas vietnē TED. Šie oficiāli spēkā esošie dokumenti ir tieši pieejami, noklikšķinot uz šajā lapā iegultajām saitēm. Sīkāku informāciju skatiet paziņojumā par izskaidrojamību un atbildību publiskā iepirkuma jomā.