Málta-Floriana: High voltage installation work
The Contracting Authority intends to issue a tender for the design, installation and commissioning of:
a) One (1) 250MVA auto-transformer in Maghtab, Malta;
b) One(1) 120MVAr shunt reactor in Maghtab, Malta;
b) One (1) 240MVAr shunt reactor in Ragusa, Italy.
The equipment is required as part of the second interconnection project between Maghtab, Malta and Ragusa, Sicily required to further diversify the island’s energy sources and meet the projected increase in electricity demand from economic growth and electrification of the transport sector whilst enabling the ingress of further renewable energy in the local side. The contractor shall design in accordance to the parameters established in the tender.
An t-ábhar seo a fhoilsítear ar an leathanach seo, is mar sheirbhís bhreise amháin atá sé beartaithe agus níl aon éifeacht dhlíthiúil aige. Ní ghabhann institiúidí an Aontais aon dliteanas orthu féin i leith inneachar an téacs. Is iad na leaganacha oifigiúla de na fógraí tairisceana ábhartha na cinn a fhoilsítear i bhForlíonadh Iris Oifigiúil an Aontais Eorpaigh agus atá ar fáil in TED. Is féidir teacht ar na téacsanna oifigiúla sin ach na naisc atá leabaithe sa leathanach seo a bhrú. Chun tuilleadh eolais a fháil, féach an fógra maidir le Inmhínitheacht agus Dilteanas Soláthair Phoiblí.