-
Fógartha06/10/2020
-
An dáta foilsithe measta14/05/2021
-
Inniu16/07/2026
Áirgiúlachtaí
Iorua, an-Osló: Construction work
The project New Water Supply Oslo (Norwegian abbreviation: NvO) invites machine suppliers of relevant tunnel boring machines (referred to as TBM) to 1-on-1 meetings regarding the pending tender contest for the project E6 Clean water tunnel. In the meetings with the suppliers, NvO wants to identify technical possibilities and possible limitations in the current technology when choosing a TBM type, etc. for drilling the 12 km long clean water tunnel with an internal diameter of approx. 6.5 m.
An t-ábhar seo a fhoilsítear ar an leathanach seo, is mar sheirbhís bhreise amháin atá sé beartaithe agus níl aon éifeacht dhlíthiúil aige. Ní ghabhann institiúidí an Aontais aon dliteanas orthu féin i leith inneachar an téacs. Is iad na leaganacha oifigiúla de na fógraí tairisceana ábhartha na cinn a fhoilsítear i bhForlíonadh Iris Oifigiúil an Aontais Eorpaigh agus atá ar fáil in TED. Is féidir teacht ar na téacsanna oifigiúla sin ach na naisc atá leabaithe sa leathanach seo a bhrú. Chun tuilleadh eolais a fháil, féach an fógra maidir le Inmhínitheacht agus Dilteanas Soláthair Phoiblí.