-
Foilsithe14/05/2013
-
Sprioc‑am11/06/2013
-
Inniu31/08/2026
Áirgiúlachtaí
UK-Middlesbrough: Unloading equipment
A circa 18 month contract for the design, procurement, delivery to site, off-loading, construction, installation and commissioning (including all testing) of a facility for the import, storage and export by rail of a minimum of 3.6 million tonnes per annum of wood pellets through Teesport. The works consist of a ship unloading system, a material handling conveyor system, a 150,000te storage facility, a rail filling conveying system, rail sidings, road works and associated utility service provision.
42418920 - Unloading equipment
45233100 - Construction work for highways, roads
45220000 - Engineering works and construction works
45234115 - Railway signalling works
42418500 - Mechanical handling equipment
71320000 - Engineering design services
71323200 - Plant engineering design services
42418000 - Lifting, handling, loading or unloading machinery
An t-ábhar seo a fhoilsítear ar an leathanach seo, is mar sheirbhís bhreise amháin atá sé beartaithe agus níl aon éifeacht dhlíthiúil aige. Ní ghabhann institiúidí an Aontais aon dliteanas orthu féin i leith inneachar an téacs. Is iad na leaganacha oifigiúla de na fógraí tairisceana ábhartha na cinn a fhoilsítear i bhForlíonadh Iris Oifigiúil an Aontais Eorpaigh agus atá ar fáil in TED. Is féidir teacht ar na téacsanna oifigiúla sin ach na naisc atá leabaithe sa leathanach seo a bhrú. Chun tuilleadh eolais a fháil, féach an fógra maidir le Inmhínitheacht agus Dilteanas Soláthair Phoiblí.