Publications Office of the EU
DK-Gentofte: Machinery and apparatus for filtering or purifying gases - Tairscintí AE
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

DK-Gentofte: Machinery and apparatus for filtering or purifying gases

  • Foilsithe
    11/10/2011
  • Sprioc‑am
    31/10/2011
  • Bronnta
    09/02/2012
  • Inniu
    11/06/2026
Stádas
Bronnta
Cineál conartha
Supplies
Faoi réir athnuachana
No
Ceannaitheoir
Níl fáil air
An áit feidhmíochta
NUTS code: DK042 Østjylland
Suíomh an cheannaitheora
NUTS code: Níl fáil air
Earnáil gnó (Príomh-CPV)
42514000 Machinery and apparatus for filtering or purifying gases
Luach measta iomlán an chonartha (gan CBL san áireamh)
Níl fáil air
Luach deiridh iomlán an chonartha (gan CBL san áireamh)
Níl fáil air
Uimhir thagartha na tairisceana
2-00381
Cur síos

The main data of the existing plant are as follows:
1. Flue gas amount: 71,5 kg/s;
2. Gas turbine, model GE LM250PE;
3. Degasification type: Aalborg Ciserv A/S LV24;
4. Current NOx level, both with and without water injection:
a) Without water injection: 1 100 mg/Nm3;
b) With water injection: 680 mg/Nm3.
The new SCR (selective catalytic reduction) plant must comply with the following requirements:
5. The following emissions must as a minimum be observed after installation and commissioning. When determining the level of NOx emission, all NOx must be converted into NO2. In practise, the emission of NO and NOx is measured in ppm. The found values must be added up and the sum must be converted into mg/normal m3 NO2 by the use of the conversion factor for NO2.
— The NOx emission must be kept under 150mg/Nm3 (reference state: 5 % 02, 0 degrees Celsius, 101.3 kPa, dry gas under all operational conditions,
— The ammonia emission must be kept under 12mg/Nm3 (reference state: 5 % 02, 0 degrees Celsius, 101.3 kPa, dry gas under all operational conditions.
The following is included in the supply:
— The existing ammonia storage must be used (24 % dissolution, (NH3) in connection with the installation of the plant,
— Pipe routing, pumps and electrical installation as regards connection to existing ammonia storage,
— Assembly and installation in the time frame (May 2012, June 2012, July 2012),
— Commissioning in the time frame (August 2012). Must be able to comply with emission requirements as of 1.9.2012,
— Scaffolding, insulation in connection with assembly and installation,
— Commissioning,
— Documentation Electronic + 2 x hard copy,
— Operational description (maintenance manuals) electronic + 2 x hard copy,
— C&I concept for control system (Siemens T-3000),
— Third party control and verification of emissions in connection with commissioning,
— KKS numbering of drawings, components, pipe routing and cables.

Conas tairiscint a chur isteach
Níl fáil air
Is féidir tairiscintí a chur isteach
Submission for all lots
Eolas maidir le conradh poiblí, creat-chomhaontú nó córas dinimiciúil ceannaigh (CDC)
Tá conradh poiblí i gceist leis an bhfógra
Coinníollacha maidir le tairiscintí a oscailt (dáta)
Níl fáil air
An áit feidhmíochta
Modh bronnta
The most economic tender
Luach measta
Níl fáil air
Luach conartha deiridh
Níl fáil air
Conradh a bhronnadh
Ainm oifigiúil: Industrivarme
Seoladh poist: Landholmvej 12
Baile: Storvorde
Cód poist: 9280
Tír: DNK
Réamheolas
Conradh
Dámhachtain
Footnote - legal notice

An t-ábhar seo a fhoilsítear ar an leathanach seo, is mar sheirbhís bhreise amháin atá sé beartaithe agus níl aon éifeacht dhlíthiúil aige. Ní ghabhann institiúidí an Aontais aon dliteanas orthu féin i leith inneachar an téacs. Is iad na leaganacha oifigiúla de na fógraí tairisceana ábhartha na cinn a fhoilsítear i bhForlíonadh Iris Oifigiúil an Aontais Eorpaigh agus atá ar fáil in TED. Is féidir teacht ar na téacsanna oifigiúla sin ach na naisc atá leabaithe sa leathanach seo a bhrú. Chun tuilleadh eolais a fháil, féach an fógra maidir le Inmhínitheacht agus Dilteanas Soláthair Phoiblí.