Creation of a furnace, boiler and smoke treatment as part of the renewal of Satom SA’s waste treatment plant
The INOSAT L2 project includes, in the Chute to Stack lot, the "oven-boiler" (F.C.) and "smoke treatment" (F.T.) processes, including the related electrical and control technology. The Chute to Stack lot includes furnace and boiler elements with a gridded municipal waste incineration line with a nominal capacity of 15 t/h and a gross thermal capacity of 56 MW in a new incineration building to be built at the northern end of the existing pit. This lot includes the design, delivery, assembly and commissioning of combustion (air system, grate, combustion control and slag extraction) as well as the boiler, the 3-field electrofilter, the external economiser and all necessary auxiliary systems (conveyors, pumps, pipes, piping, instrumentation, actuators, wiring, etc.). In addition, the Chute to Stack lot includes the treatment of fumes for a flow rate of approximately 80’000 Nm3/h. It includes the design, delivery, assembly and commissioning of a four-stage wet washing unit (quench/acid stage, neutral stage, fine dust removal, condensation stage), an SCR system on clean fumes (steam-smoked exchanger, ammoniacal water injection, SCR catalyst), two smoke-smoked exchangers (washer system and SCR system), a draft fan, a smoke-water exchanger and a chimney with all the necessary auxiliary units (pumps, pipes, piping, instrumentation, actuators, wiring, etc.). The Chute to Stack lot also includes medium and low voltage systems and control technology for the new line.
https://www.simap.ch/fr/redirect?context=eyJwYWdlIjoicHJvamVjdCIsInJvbGUiOm51bGwsIm9yZ0lkIjpudWxsLCJwcm9qZWN0SWQiOiI3NDY0ZDM2Yi03MjdhLTQ2MjctODlkZi1lMmRiYWRlZTU4YWQiLCJsb3RJZCI6bnVsbCwic3Vic2NyaXB0aW9uSWQiOm51bGx9
https://www.simap.ch/fr/redirect?context=eyJwYWdlIjoicHJvamVjdCIsInJvbGUiOm51bGwsIm9yZ0lkIjpudWxsLCJwcm9qZWN0SWQiOiI3NDY0ZDM2Yi03MjdhLTQ2MjctODlkZi1lMmRiYWRlZTU4YWQiLCJsb3RJZCI6bnVsbCwic3Vic2NyaXB0aW9uSWQiOm51bGx9
42000000 - Industrial machinery
42160000 - Boiler installations
42162000 - Steam-generating boilers
45200000 - Works for complete or part construction and civil engineering work
51000000 - Installation services (except software)
Type: quality
Description: Critères d’adjudication
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.