Design, manufacture, supply, transportation, installation, testing and commissioning of turbo-compressor packages for the high pressure natural gas pipeline. Indicatively each package will be complete with:
— gas turbine and centrifugal natural gas compressor,
— combustion air intake system,
— fuel gas system skid,
— gas turbine dry low emission system,
— gas turbine discharge stack with silencer,
— gas turbine enclosure complete with fire detection and firefighting systems for indoor installation,
— lubricating system for the turbine and for the driven compressor units and lubricating oil cooler,
— water washing system; control cabinet for start-up, speed control, load sharing and anti-surge,
— suction pressure throttling, recycling and anti-surge valves,
— motor control center,
— painting, tracing and insulation,
— packaging and delivery to site,
— full installation on site,
— start-up, commissioning, testing and training,
— all associated ancillary systems,
— installation start-up and commissioning spares.
Innehållet på den här sidan är enbart avsett som en extratjänst och har ingen rättslig verkan. EU-institutionerna tar inget ansvar för innehållet. De officiella versionerna av relevanta upphandlingsmeddelanden är de som offentliggörs i tillägget till Europeiska unionens officiella tidning (EUT S) och som finns tillgängliga i TED. De officiella texterna är direkt tillgängliga via länkarna på den här sidan. Läs mer i meddelandet om förklarbarhet och ansvar inom offentlig upphandling.