The Contracting Authority intends to issue a tender for the design, installation and commissioning of:
a) One (1) 250MVA auto-transformer in Maghtab, Malta;
b) One(1) 120MVAr shunt reactor in Maghtab, Malta;
b) One (1) 240MVAr shunt reactor in Ragusa, Italy.
The equipment is required as part of the second interconnection project between Maghtab, Malta and Ragusa, Sicily required to further diversify the island’s energy sources and meet the projected increase in electricity demand from economic growth and electrification of the transport sector whilst enabling the ingress of further renewable energy in the local side. The contractor shall design in accordance to the parameters established in the tender.
Obsah tejto stránky predstavuje len doplnkový zdroj informácií a nemá žiadny právny účinok. Inštitúcie Únie nenesú za tento obsah nijakú zodpovednosť. Úradné verzie príslušných oznámení o vyhlásení verejného obstarávania sú uverejnené v dodatku k Úradnému vestníku Európskej únie a sú k dispozícii v databáze TED. Tieto úradné znenia sú priamo dostupné prostredníctvom odkazov uverejnených na tejto stránke. Viac informácií nájdete v oznámení o zásadách vysvetliteľnosti a zodpovednosti vo verejnom obstarávaní.