Publications Office of the EU
Achiziționarea unui contract la cheie Hovseter - un nou departament special - Licitații UE
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

Această pagină conține conținut generat automat pentru a îmbunătăți găsirea și accesibilitatea

- indică codurile CPV deduse din textul procedurii

- indică textul tradus automat în limba de navigare

Achiziționarea unui contract la cheie Hovseter - un nou departament special

  • Publicată
    17/08/2026
  • Termenul-limită
    09/10/2026
  • Astăzi
    11/10/2026
Statut
Depuneri încheiate
Tipul de contract
Works
Reînnoire a unei proceduri existente
Yes
Achizitor
Oslo kommune v/ Oslobygg KF
Locul de executare
NUTS code: Mai multe locuri de executare
Locația achizitorului
NUTS code: NO081 Oslo
Sectorul de activitate (codul CPV principal)
45000000 Lucrări de construcţii
Valoarea totală estimată a contractului (fără TVA)
Informație indisponibilă
Valoarea totală finală a contractului (fără TVA)
Informație indisponibilă
Numărul de referință al procedurii
7432
Descriere

Oslobygg KF a primit sarcina de a înființa un nou departament special la școala Hovseter pentru elevii diagnosticați cu tulburări din spectrul autismului. Suprafața totală brută (suprafața brută) este de 1.234 m² distribuită pe două etaje, precum și o cameră tehnică de acoperiș. Clădirea trebuie să fie construită din lemn masiv, cu suprafețe vizibile din lemn și capace exterioare din aluminiu și trebuie să îndeplinească cerințele pentru standardele plus house. Clădirea trebuie să dispună de sisteme robuste și adaptate care să răspundă nevoilor grupului-țintă. Se stabilește o zonă exterioară separată care să fie integrată în instalațiile exterioare existente. Pentru informații suplimentare cu privire la atribuire, a se vedea partea II din documentația de atribuire și anexele care o însoțesc.

Metoda de depunere
Electronic via:
https://app.artifik.no/procurements/7432
Ofertele pot fi depuse
Transmitere electronică: necesară
https://app.artifik.no/procurements/7432
Informații despre un contract de achiziții publice, un contract-cadru sau un sistem dinamic de achiziție (DPS)
Informație indisponibilă
Condiții de deschidere a ofertelor (dată)
Informație indisponibilă
Locul de executare
Metoda de atribuire
Criteriu:
Tip: price
Descriere: Price
Ponderare (procentaj, valoare exactă): 70
Criteriu:
Tip: quality
Descriere: The offered personnel ́ competence and experience
Ponderare (procentaj, valoare exactă): 10
Criteriu:
Tip: quality
Descriere: Assignment comprehension
Ponderare (procentaj, valoare exactă): 20
Criteriu:
Tip: quality
Descriere: In this procurement, the environment is not weighted as an award criteria by 30%. The contracting authority has chosen to have strict minimum requirements for the environment that, according to the contracting authority ́s assessment, will give a better environmental effect than setting the environment as an award criteria. Pursuant to the Public Procurement Act § 5b, second paragraph, the fourth period, the Contracting Authority is obliged to provide a justification for this in the procurement documents. In this procurement, emission free construction sites and all machines that are used at the construction site shall be emission free from the start of construction until completion. The transport shall be carried out by using vehicles with zero emission or biogas technology. Furthermore, there are requirements to map and prioritise the reuse of at least five different types of components in the project, and as many components as possible shall be disassembled and reused during future demolition or alterations to the building. The building shall be constructed as a solid wood plus house and solar panels and well parks shall be established. Climate gas accounts shall be prepared in accordance with NS3720, and a separate requirement is made as to the maximum climate gas emissions from materials thereof. In the competition tenderers shall price an option on extreme low carbon concrete. The contract also states that waste from the construction site shall be source sorted and a minimum of 90 percent of the waste shall be sorted and delivered to a certified waste disposal site or directly for recycling.    The contracting authority has also chosen to award fulfilment of some environmental aspects in the contract period with a bonus. This applies to emission-free transport, and is being done in order to achieve further reductions of the environmental and climate impact within what has been identified and assessed as suitable themes. By setting such minimum requirements, it is ensured better climate and environmental effect than by setting up the award criteria(s) associated with the environment. The exclusionary provision in the Public Procurement Act § 5b, second paragraph, third period will therefore apply. 
Ponderare (procentaj, valoare exactă): 0
Valoarea estimată
Informație indisponibilă
Valoare contractată finală
Informație indisponibilă
Atribuirea contractului
Informație indisponibilă
Anunț de intenție
Anunț de participare
Anunț de atribuire
Footnote - legal notice

Conținutul publicat pe această pagină este doar un serviciu suplimentar și nu are efect juridic. Instituțiile Uniunii nu își asumă răspunderea pentru acest conținut. Versiunile oficiale ale anunțurilor de participare relevante sunt cele publicate în suplimentul la Jurnalul Oficial al Uniunii Europene și disponibile pe TED. Aceste texte oficiale pot fi consultate direct accesând linkurile indicate pe această pagină. Pentru mai multe informații, consultați avizul privind explicabilitatea și responsabilitatea în materie de achiziții publice.