UK-Perth: Construção de linhas para o transporte de electricidade
The Contracting Entity, Scottish Hydro Electric Transmission Limited (SHETL) is engaged in the reinforcement and development of its electricity transmission network for the purposes of supporting the expansion of renewable energy generation in the North of Scotland. The existing reinforcement and development programme has an anticipated duration of 8 to 10 years.
Part of this programme of works includes the increase in capacity/reinforcement of its overhead line transmission network. This will involve both an upgrade of some its current transmission network as well as the installation of new transmission lines. It is the intention of SHETL to enter into framework contracts with relevant economic operators to provide these works on its behalf. SHETL reserves the right to award any number of contracts or none at all. The nature of these works includes but is not limited to the detailed design, supply, installation, construction and commissioning or refurbishment of overhead transmission lines across Scotland as required.
Acordo-quadro com several operadores
Os conteúdos publicados nesta página constituem apenas um serviço complementar e não produzem efeitos jurídicos. As Instituições da União não assumem qualquer responsabilidade por estes conteúdos. As versões oficiais dos anúncios de concursos públicos são as publicadas no Suplemento do Jornal Oficial da União Europeia e disponíveis no TED. É possível aceder diretamente a esses textos oficiais através das ligações incluídas nesta página. Para mais informações, consulte a declaração relativa à explicabilidade e responsabilidade em matéria de contratação pública.