-
Publicado19/08/2024
-
Prazo limite18/09/2024
-
Hoje19/09/2026
Ferramentas
- assinala texto traduzido automaticamente para a sua língua de navegação
Carcaça II
approx. 830 m2 substructure for wall covering - approx. 481 m2 wall cladding "OP rooms" made of stainless steel, 1 mm with GK core 18 mm - approx. 144 m2 wall cladding "OP hallway" / "introduction" made of pre-coated steel, 1 mm galvanised - approx. 320 m2 plasterboard wall "OP sterile floor" / "hallway" - approx. 20 pcs. sliding door, 1 pcs., manually operated, A = 1300 mm or A = 1500 mm - approx. 298 m2 metal cassette ceiling incl. substructure manufactured with complete protection against dust penetration - approx. 6 pcs. ceiling system OP 2600m3/h or 3600m3/h - approx. 2 pcs. work table installation introduction - approx.
https://www.staatsanzeiger-eservices.de
https://www.staatsanzeiger-eservices.de
Os conteúdos publicados nesta página constituem apenas um serviço complementar e não produzem efeitos jurídicos. As Instituições da União não assumem qualquer responsabilidade por estes conteúdos. As versões oficiais dos anúncios de concursos públicos são as publicadas no Suplemento do Jornal Oficial da União Europeia e disponíveis no TED. É possível aceder diretamente a esses textos oficiais através das ligações incluídas nesta página. Para mais informações, consulte a declaração relativa à explicabilidade e responsabilidade em matéria de contratação pública.