Prior information notice - contract OB1 - Water and sewage installations (sea and land).
MOVAR shall expand Fuglevik treatment facility (RA) capacity wise for the future, and to include sewage water that is now cleaned at Kambo RA, which shall be reconstructed to a pre-treatment facility and pump station. MOVAR received a new discharge licence from the Manager in Oslo and Viken, where, from 2026, there will be a requirement for reduction of both phosphor, nitrogen and organic matter. The project is referred to as "Cleaner Oslofjord", and is again divided into two sub-projects «Nye Fuglevik Renseanlegg» and «Overføringsanlegg». The part-project «Overføringsanlegget» comprises laying an approx. 15 km long sewage pipeline from Brevik via Kambo and to Fuglevik Treatment Facility. This sea and land pipeline will run in Mossesundet, cross the infrastructure between Moss and Jeløy, and continue out in Værlebukta to Fuglevik RA. It also includes alterations to the current treatment facility at Kambo to a pump station, a new pump station at Brevik and renovation of Møllebakken pump station. This procurement, OB1 – Water and Sewage installations (sea and land) is one of three planned contracts in the sub-project 'The Transfer Facility'. The contract will be an execution contract in accordance with NS8405 and particularly applies to laying a transfer pipeline for sewage Brevik – Kambo – Fuglevik. The total route of approx. 14,750 m is divided into seven areas. The pipeline will lead sewage from Brevik and Cambodia to the new Fuglevik treatment facility. The pipeline dimensions and SDR classes are planned with ø450mm PE100 SDR13,6 from Brevik to Kambo, Ø710mm PE100 SDR13,6 from Kambo to Sjøbadet in Moss and Ø900mm PE100 SDR13,6 from Sjøbadet in Moss to landtak Fuglevik. Ø700mm cast iron pipes are used from landtake Fuglevik to RA Fuglevik. A new discharge pipeline shall be laid from the existing discharge foam by the beach at Fuglevik and up to 50 m water depth; Ø1200mm PE100 SDR17. The contract will include strict environmental requirements, including the considerations that must be taken for life in water and the general public use of the area, as well as requirements for taking into account the complexity of controlled drilling in the Moss Canal. The competition is planned to be announced early In April 2025.
44130000 - Katusi ewlenija tad-dranaġġ
44161400 - Pipeline ta' taħt l-ilma
44161410 - Pipeline ta' taħt il-baħar
44160000 - Pipelines, piping, pakpijiet, casing, tubi u oġġetti relatati
44163111 - Pajpijiet tad-dranaġġ
42996110 - Maċeraturi għat-trattament tad-drenaġġ
45332300 - Xogħol tat-tqegħid tal-katusi tad-drena
45231300 - Xogħol tal-kostruzzjoni tal-linji tal-pajpijiet ta’ l-ilma u tad-drenaġġ
45232411 - Xogħol ta' kostruzzjoni ta' katusi għall-ilma maħmuġ
45231100 - Xogħol ġenerali tal-kostruzzjoni għal-linji tal-pajpijiet
45231111 - L-erfiegħ u t-tqegħid mill-ġdid tal-linji tal-pajpijiet
45232453 - Xogħol ta' kostruzzjoni ta’ drejns
45232100 - Xogħlijiet anċillarji għal-linji ta’ l-ilma
45232000 - Xogħlijiet anċillarji għal-linji tal-pajpijiet u l-cables
Dan il-kontenut ippubblikat f’din il-paġna hu maħsub purament bħala servizz addizzjonali u m’għandu ebda effett legali. L-istituzzjonijiet tal-Unjoni ma jassumu ebda responsabbiltà għall-kontenut tiegħu. Il-verżjonijiet uffiċjali tal-avviżi rilevanti dwar l-offerti huma dawk ippubblikati fis-Suppliment tal-Ġurnal Uffiċjali tal-Unjoni Ewropea u disponibbli fit-TED. Dawk it-testi uffiċjali huma aċċessibbli direttament permezz tal-links inkorporati f’din il-paġna. Għal aktar informazzjoni jekk jogħġbok ara l-Avviż ta’ Spjegabbiltà u Responsabbiltà tal-Akkwist Pubbliku.