-
Ippubblikat05/04/2014
-
Skadenza12/05/2014
-
Aġġudikat28/05/2014
-
Illum31/08/2026
Utilitajiet
Ir-Renju Unit-Giffnock: Bini modulari u portabbli
East Renfrewshire Council requires a Modular Building System to be annexed to the existing St Cadoc's Primary School, Crookfur Road, Newton Mearns G77 6TT. The Modular Building System is required to co-ordinate with the overall operational layout of the school. Due to specific time constraints the work must be completed by Friday 8.8.2014.
The Contract will be subject to the terms and conditions of the SBCC Design & Build for use in Scotland (2011 edition).
Isem uffiċjali: East Renfrewshire Council
Indirizz postali: Eastwood HQ, Eastwood Park
Belt: Giffnock
Kodiċi postali: G46 6UG
Pajjiż: GBR
Indirizz postali: Greenhills Industrial Estate, Coltswood Road
Belt: Coatbridge
Kodiċi postali: ML5 2AG
Pajjiż: GBR
Dan il-kontenut ippubblikat f’din il-paġna hu maħsub purament bħala servizz addizzjonali u m’għandu ebda effett legali. L-istituzzjonijiet tal-Unjoni ma jassumu ebda responsabbiltà għall-kontenut tiegħu. Il-verżjonijiet uffiċjali tal-avviżi rilevanti dwar l-offerti huma dawk ippubblikati fis-Suppliment tal-Ġurnal Uffiċjali tal-Unjoni Ewropea u disponibbli fit-TED. Dawk it-testi uffiċjali huma aċċessibbli direttament permezz tal-links inkorporati f’din il-paġna. Għal aktar informazzjoni jekk jogħġbok ara l-Avviż ta’ Spjegabbiltà u Responsabbiltà tal-Akkwist Pubbliku.