-
Imħabbar25/09/2015
-
Ippubblikat12/11/2015
-
Skadenza29/12/2015
-
Illum27/08/2026
Utilitajiet
- jindika l-kodiċijiet CPV miġbura mit-test tal-proċedura
Ir-Renju Unit-Swindon: Armarjijiet tad-dħaħen
This project involves the replacement of the existing fume cupboards in the following Laboratories at the National Oceanography Centre, Southampton.
184/05
161/05
781/02
781/05
781/09
161/16
161/36
781/02
The existing services to the Fume Cupboards will be reconfigured to supply the new units. The existing scrubbers will be replaced with new.
Supply air handling plant AHU 1/161 & AHU 1/781 will be refurbished to improve system performance. The ventilation to the laboratories will be rebalanced with the aim to maintain the correct pressure hierarchy.
Additionally the works require:
— the provision of protective screening to protect retained finishes / benches in the laboratories;
— stripping out worn / defective vinyl sheet flooring;
— preparing and decorating previously decorated wall surfaces;
— preparing the substrate and laying new vinyl sheet flooring;
— cleaning of flooring and other surfaces, and removal of protection.
Isem uffiċjali: Crown Commercial Services
39141500 - Armarjijiet tad-dħaħen
45000000 - Xogħol tal-kostruzzjoni
Dan il-kontenut ippubblikat f’din il-paġna hu maħsub purament bħala servizz addizzjonali u m’għandu ebda effett legali. L-istituzzjonijiet tal-Unjoni ma jassumu ebda responsabbiltà għall-kontenut tiegħu. Il-verżjonijiet uffiċjali tal-avviżi rilevanti dwar l-offerti huma dawk ippubblikati fis-Suppliment tal-Ġurnal Uffiċjali tal-Unjoni Ewropea u disponibbli fit-TED. Dawk it-testi uffiċjali huma aċċessibbli direttament permezz tal-links inkorporati f’din il-paġna. Għal aktar informazzjoni jekk jogħġbok ara l-Avviż ta’ Spjegabbiltà u Responsabbiltà tal-Akkwist Pubbliku.