-
Ippubblikat26/01/2021
-
Skadenza06/04/2021
-
Ftuħ tal-offerti13/04/2021
-
Aġġudikat05/08/2021
-
Illum12/08/2026
Utilitajiet
il-Bosnja-Ħerzegovina-Sarajevo: Xogħol tal-kostruzzjoni tal-bini
In order to modernize existing facilities of the Municipal Court in Zenica, both reconstruction and the construction are to be combined in this project. The construction of 6 levels high (B+GF+4) annex-building will provide additional space and functionalities and will connect existing buildings of Municipal Court with Cantonal Prosecutor's Office. The new structure is designed as reinforced concrete skeleton with slab foundation and prefabricated partition walls. Also, mayor reconstruction of the basement and the ground floor as well as replacement of the façade of the building in function is planned. All the works are to be performed in parallel to every day court work, thus strong coordination among all stakeholders is required.
Isem uffiċjali: European Union, represented by the European Commission, on behalf of and for the account of Bosnia and Herzegovina
Belt: Brussels
Kodiċi NUTS: BE100
Kodiċi postali: B-1049
Pajjiż: BEL
Indirizz prinċipali: https://ec.europa.eu/neighbourhood-enlargement/node_en
Indirizz postali: Zmaja od Bosne bb (Poduzetnička zona 1)
Belt: Zenica
Kodiċi postali: 72000
Pajjiż: BIH
Dan il-kontenut ippubblikat f’din il-paġna hu maħsub purament bħala servizz addizzjonali u m’għandu ebda effett legali. L-istituzzjonijiet tal-Unjoni ma jassumu ebda responsabbiltà għall-kontenut tiegħu. Il-verżjonijiet uffiċjali tal-avviżi rilevanti dwar l-offerti huma dawk ippubblikati fis-Suppliment tal-Ġurnal Uffiċjali tal-Unjoni Ewropea u disponibbli fit-TED. Dawk it-testi uffiċjali huma aċċessibbli direttament permezz tal-links inkorporati f’din il-paġna. Għal aktar informazzjoni jekk jogħġbok ara l-Avviż ta’ Spjegabbiltà u Responsabbiltà tal-Akkwist Pubbliku.