Ir-Renju Unit-Truro: Servizzi ta' perizja, kostruzzjoni, inġinerija u spezzjoni

  • Aġġudikat
    01/09/2015
  • Illum
    21/09/2026
Status
Aġġudikat
Tip ta’ kuntratt
Services
Suġġett għat-Tiġdid
No
Xerrej
Mhux disponibbli
Post tal-prestazzjoni
NUTS code: Post multiplu ta’ prestazzjoni
Post tax-xerrej
NUTS code: Mhux disponibbli
Settur tan-negozju (CPV ewlieni)
71000000 Servizzi ta' perizja, kostruzzjoni, inġinerija u spezzjoni
Stima tal-valur totali tal-kuntratt (eskluża l-VAT)
Mhux disponibbli
Valur totali finali tal-kuntratt (eskluża l-VAT)
224,500.00 GBP
Numru ta’ referenza tal-offerta
2015.13F
Deskrizzjoni

It is a Statutory Legal Requirement that the Maintenance Gantries of the Tamar Road Bridge are fully inspected at 6 yearly intervals.
The Tamar Road Bridge is part of the A38 Trunk Road and crosses the River Tamar on the border between Devon and Cornwall. The crossing is jointly owned by Cornwall Council and Plymouth City Council (the Joint Authority) and operated on behalf of the 2 authorities by the Tamar Bridge and Torpoint Ferry Joint Committee (TBTF).
There are four maintenance gantries, which are under the main deck and cantilevers of the Bridge and were installed in 1998 and 2001.
The gantries traverse along rails suspended from the underside of the Tamar Bridge, and they now require their second 6 yearly Principal Inspection.
In order to provide a more stable environment unaffected by the weather, it is envisaged that the gantries and bogeys will require to be lowered from the bridge and removed from site for inspection and structural load testing and then re-erected.
This contractual work is anticipated to take up to a maximum period of 12 months.
A detailed report is to be produced identifying all of the defects found and what remedial works are required, as well as an indication of the costs estimated to repair them. The testing will include Structural Load Testing of the gantries.
Therefore, the information gleaned from the inspection will effectively inform the specification for the follow up tendering exercise to appoint a suitable maintenance company to actually carry out the majority of the maintenance works required, although it is possible that some more urgent remedial maintenance work may be required to be undertaken by the company appointed for the initial Gantry Inspection work or its recognised sub contractor.

Metodu ta' Sottomissjoni
Mhux disponibbli
Jistgħu jiġu sottomessi offerti
Not applicable
Informazzjoni dwar kuntratt pubbliku, ftehim ta' qafas jew sistema dinamika ta' xiri (DSX)
Mhux disponibbli
Kundizzjonijiet għall-ftuħ tal-offerti (data)
Mhux disponibbli
Metodu tal-għoti
The most economic tender
Valur stmat
Mhux disponibbli
Valur kuntrattwali finali
224,500.00 GBP
Għoti tal-kuntratt
Isem uffiċjali: RHC Lifting limited
Indirizz postali: Unit 6 Easter Court, Westerleigh Business Park, Yate
Belt: Bristol
Kodiċi postali: BS37 5YS
Pajjiż: GBR
Informazzjoni minn qabel
Kuntratt
Għoti
Footnote - legal notice

Dan il-kontenut ippubblikat f’din il-paġna hu maħsub purament bħala servizz addizzjonali u m’għandu ebda effett legali. L-istituzzjonijiet tal-Unjoni ma jassumu ebda responsabbiltà għall-kontenut tiegħu. Il-verżjonijiet uffiċjali tal-avviżi rilevanti dwar l-offerti huma dawk ippubblikati fis-Suppliment tal-Ġurnal Uffiċjali tal-Unjoni Ewropea u disponibbli fit-TED. Dawk it-testi uffiċjali huma aċċessibbli direttament permezz tal-links inkorporati f’din il-paġna. Għal aktar informazzjoni jekk jogħġbok ara l-Avviż ta’ Spjegabbiltà u Responsabbiltà tal-Akkwist Pubbliku.