Biogas plant - design and build contract - technology and civil works - Rå Biopark
Note: Toutes les informations relatives à cette procédure n’ont pas été correctement traitées. Veuillez consulter les documents liés pour en savoir plus.
Rå Biopark shall build a biogas plant. The plant and construction site are in Storfjord municipality, in Skibotn, approximately two hours' drive from the city of Tromsø. The supplier that is awarded this design and build contract has a complete and overall responsibility to deliver a complete and well-functioning biogas plant according to the requirements specification and contract terms in this competition. This responsibility includes processes, machinery, equipment, technical support systems, technology and construction works necessary to produce liquid biogas as described in the specification. The supplier is responsible for delivering everything needed to make the biogas plant work. This includes, but is not limited to, the entire process from planning and engineering to construction and follow-up during the defect notification/complaint period. The Supplier is responsible for all engineering, materials, machinery and equipment needed to fulfil the Client's needs for a functioning biogas plant that meets all agreed requirements. The Supplier is also responsible for providing infrastructure at the construction site and building elements such as electricity and technical systems, pipes, water and sewage, control systems, odour management systems, fire alarm systems, etc. The supplier has full responsibility for the interface between all parts of the biogas plant that are relevant to the contract, including the building and construction work (the construction part). The Supplier shall be responsible for testing the plant, and follow-up during the complaint period, as well as training the Client's personnel to operate the plant. The supplier is encouraged to familiarise itself with the entire requirements specification (Appendix A) even if not all parts (lots/systems) apply to this EPC contract.The requirements specification is largely function-based, so it is up to the Supplier to find good solutions that fulfil the Client's described requirements and needs. The contract is based on the Norwegian standard contract NS 8407, which applies as general contractual provisions, with special provisions in addition.
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=389995&B=
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=389995&B=
45255800 - Travaux de construction d'unités de production de gaz
45210000 - Travaux de construction de bâtiments
44622000 - Systèmes de récupération de chaleur
71323200 - Services de conception technique d'usines
09110000 - Combustibles solides
45000000 - Travaux de construction
45200000 - Travaux de construction complète ou partielle et travaux de génie civil
45223000 - Travaux de construction d'ouvrages
45350000 - Installations mécaniques
45220000 - Ouvrages d'art et de génie civil
45222100 - Travaux de construction d'usines de traitement des déchets
09000000 - Produits pétroliers, combustibles, électricité et autres sources d'énergie
09120000 - Combustibles gazeux
51810000 - Services d'installation de citernes
51900000 - Services d'installation de systèmes de guidage et de commande
45100000 - Travaux de préparation de chantier
45255000 - Travaux de construction pour l'industrie du pétrole et du gaz
45400000 - Travaux de parachèvement de bâtiment
42000000 - Machines industrielles
42514000 - Machines et appareils de filtration ou de purification des gaz
42520000 - Matériel de ventilation
71320000 - Services de conception technique
51500000 - Services d'installation de machines et d'équipements
45351000 - Travaux d'installation en construction mécanique
90510000 - Élimination et traitement des ordures
45300000 - Travaux d'équipement du bâtiment
76100000 - Services professionnels relatifs à l'industrie du gaz
Le contenu publié sur cette page constitue uniquement une source d’information supplémentaire et n’a aucun effet juridique. Les institutions de l'Union déclinent toute responsabilité quant à son contenu. Les versions officielles des avis de marché concernés sont celles qui sont publiées au supplément du Journal officiel de l’Union européenne et qui sont disponibles sur TED. Ces textes officiels peuvent être consultés directement en cliquant sur les liens qui figurent sur cette page. Pour en savoir plus, lire l’avis sur l’explicabilité et la responsabilité en matière de marchés publics.