-
Publicado26/01/2021
-
Fecha límite06/04/2021
-
Apertura de las ofertas13/04/2021
-
Concedido(s)05/08/2021
-
Hoy15/08/2026
Utilidades
Bosnia y Herzegovina-Sarajevo: Trabajos de construcción de inmuebles
In order to modernize existing facilities of the Municipal Court in Zenica, both reconstruction and the construction are to be combined in this project. The construction of 6 levels high (B+GF+4) annex-building will provide additional space and functionalities and will connect existing buildings of Municipal Court with Cantonal Prosecutor's Office. The new structure is designed as reinforced concrete skeleton with slab foundation and prefabricated partition walls. Also, mayor reconstruction of the basement and the ground floor as well as replacement of the façade of the building in function is planned. All the works are to be performed in parallel to every day court work, thus strong coordination among all stakeholders is required.
Denominación oficial: European Union, represented by the European Commission, on behalf of and for the account of Bosnia and Herzegovina
Población/ciudad: Brussels
Código NUTS: BE100
Código postal: B-1049
País: BEL
Dirección principal: https://ec.europa.eu/neighbourhood-enlargement/node_en
Dirección postal: Zmaja od Bosne bb (Poduzetnička zona 1)
Población/ciudad: Zenica
Código postal: 72000
País: BIH
El contenido de esta página constituye exclusivamente un servicio adicional, y no tiene efectos jurídicos. Las instituciones de la UE no asumen responsabilidad alguna por su contenido. Las versiones oficiales de los anuncios de licitación pertinentes son aquellas publicadas en el suplemento del Diario Oficial de la Unión Europea y disponibles en TED. Se puede acceder a esos textos oficiales directamente mediante los enlaces integrados en esta página. Para más información, véase la declaración relativa a la explicabilidad y la responsabilidad en materia de contratación pública.