Publications Office of the EU
FCC/267/23 Multi Party Framework for the Construction of New Sports Facilities and the Refurbishment/Upgrades and Maintenance of existing facilities within Fingal County Council’s Administrative Area - Convocatorias de concursos de la UE
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

Esta página contiene contenido generado automáticamente para mejorar la capacidad de búsqueda y la accesibilidad.

- Indica los códigos CPV deducidos del texto del procedimiento

FCC/267/23 Multi Party Framework for the Construction of New Sports Facilities and the Refurbishment/Upgrades and Maintenance of existing facilities within Fingal County Council’s Administrative Area

  • Publicado
    01/12/2023
  • Fecha límite
    12/01/2024
  • Hoy
    25/08/2026
Estado
Presentaciones cerradas
Tipo de contrato
Works
Procedimiento renovado
No
Comprador
Fingal County Council_371
Lugar de ejecución
NUTS code: Lugar de ejecución múltiple
Dirección del comprador
NUTS code: No disponible
Sector comercial (CPV principal)
45212200 Trabajos de construcción de instalaciones deportivas
Valor total estimado del contrato (excluido el IVA)
20,000,000.00 EUR
Valor total final del contrato (excluido el IVA)
No disponible
Número de referencia de la oferta
FCC/267/23
Descripción

The initial contract is to develop two full size natural GAA pitches, and associated ancillary works at Ballymastone Recreational Hub, Donabate. The framework agreement will be established on foot of this initial contract. The scope of works is for the construction (design by others) of the following: i. The construction of two full size GAA natural GAA pitches to the standards set out in the Gaelic Athletic Association Performance and Construction Standards – involving significant earthworks and drainage works ii. Associated works to include ball stops, goal posts and perimeter fencing iii. A series of 3m and 5m wide bound surfaced spectator access and perimeter paths to service the new facility designed in accordance with industry best practice iv. The construction of a new engineered vehicular bridge/culverted crossing to traverse existing water course on site – for incorporation with the new path networks v. The modification/upgrade of two existing bridge crossings traversing existing water course – for incorporation with new path network

Método de presentación
Contacto alternativo por vía electrónica:
https://www.etenders.gov.ie/epps/eawarding/showTenderList.do?resourceId=2685112
Pueden presentarse ofertas
Presentación electrónica: requerido
https://www.etenders.gov.ie/epps/eawarding/showTenderList.do?resourceId=2685112
Información sobre un contrato público, un acuerdo marco o un sistema dinámico de adquisición
La contratación implica el establecimiento de un acuerdo marco
Condiciones de apertura de ofertas (fecha)
No disponible
Lugar de ejecución
Método de adjudicación
No disponible
Valor estimado
20,000,000.00 EUR
Valor final contratado
No disponible
Adjudicación del contrato
No disponible
Información previa
Contrato
Adjudicación
Footnote - legal notice

El contenido de esta página constituye exclusivamente un servicio adicional, y no tiene efectos jurídicos. Las instituciones de la UE no asumen responsabilidad alguna por su contenido. Las versiones oficiales de los anuncios de licitación pertinentes son aquellas publicadas en el suplemento del Diario Oficial de la Unión Europea y disponibles en TED. Se puede acceder a esos textos oficiales directamente mediante los enlaces integrados en esta página. Para más información, véase la declaración relativa a la explicabilidad y la responsabilidad en materia de contratación pública.