-
Publicado04/12/2019
-
Fecha límite27/02/2020
-
Concedido(s)10/03/2020
-
Hoy27/09/2026
Utilidades
Noruega-Vikersund: Trabajos de construcción para puentes
The contract includes the construction of a new Geithus bridge over the Drammen river/the lake mouth from Bergsjø. The contract includes:
— readjustment for a new road/new crossing for the new bridge,
— alteration of the current bridge to foot and cycle paths,
— removal of a suspended foot path on the current bridge,
— renovation of other structures,
— construction of an approx. 430 m long new foot and cycle path, parallel with the main road,
— access roads on both sides of the river,
— readjustment for the current and new technical pipes and conveyance paths in the ground that is affected by the measures,
— lighting for the current bridge, the new bridge and roads.
https://tendsign.no/doc.aspx?UniqueId=afnyqrxfcl&GoTo=Tender
45221100 - Trabajos de construcción para puentes
45233100 - Trabajos de construcción de autopistas y carreteras
45221110 - Trabajos de construcción de puentes
45316110 - Instalación de equipo de alumbrado para carreteras
45233260 - Trabajos de construcción de vías peatonales
45233162 - Trabajos de construcción de pistas para bicicletas
Dirección postal: Trondheimsvegen 70
Población/ciudad: Kløfta
Código postal: 2040
País: NOR
El contenido de esta página constituye exclusivamente un servicio adicional, y no tiene efectos jurídicos. Las instituciones de la UE no asumen responsabilidad alguna por su contenido. Las versiones oficiales de los anuncios de licitación pertinentes son aquellas publicadas en el suplemento del Diario Oficial de la Unión Europea y disponibles en TED. Se puede acceder a esos textos oficiales directamente mediante los enlaces integrados en esta página. Para más información, véase la declaración relativa a la explicabilidad y la responsabilidad en materia de contratación pública.