-
Published26/09/2024
-
Deadline14/10/2024
-
Opening of tenders15/10/2024
-
Awarded08/09/2025
-
Today11/06/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Exercise of construction supervision and functions of FIDIC Engineer for sites in the agglomeration of Galabovo under three lots
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Within the scope of the public procurement under each of the lots, it is envisaged to perform construction supervision activities and perform functions of FIDIC Engineer, and in the performance of the service, the Contractor will act as: Engineer within the meaning of Clause 3 of the Contractual Conditions for Technological Equipment and Design – Construction for Electrical and Machine-Installation Works and for Construction and Engineering Sites Designed by the Contractor. General Terms and Conditions - International Federation of Consulting Engineers (FIDIC), as well as the relevant Specific Terms and Conditions; Technical control of the design under a contract for design and construction (engineering) and preparation of a comprehensive report for assessment of the compliance of the investment project for the site under the respective lot described in the Technical Specification; Assessment of the compliance of investment projects with the basic requirements for construction works within the meaning of Article 142(6)(2) of the Spatial Development Act, in compliance with the requirements of Article 142(5) of the Spatial Development Act; Conformity assessment under part Structural and part Energy efficiency within the meaning of Article 142(10) and (11) of the Spatial Development Act for OP 3 and under Article 142(10) of the Spatial Development Act for OP 1 and OP 2; Construction supervision within the meaning of Article 168 of the Spatial Planning Act (ZUT); Safety and Health Coordinator for the investment design phase and for the construction phase. The subject-matter of the contract for each of the lots (OP 1, OP 2 and OP 3) shall include at least the following tasks: control of plans for temporary traffic organization in accordance with the Bulgarian legislation; approval of the materials used on the site and the documents generated in the course of construction; carrying out a documentary and physical check of the construction process; approval of detailed methods of execution of construction and installation works, as well as their scope, before their commencement; assessment and certification of the completed construction and installation works; consulting with the Assignor on all orders for change and obtaining its prior written approval before ordering changes, as well as consulting with the Assignor on all matters where this is required under the contractual terms of the engineering contract; ongoing review and approval of the reports and payment requests of the builder, issuance of payment certificates; overall control and storage of all documentation for the execution of the engineering contract; review and approval of operations manuals and staff training programmes for OP 3 only; performing all necessary activities for the purpose of acceptance of the site - review of all required documentation, review of the execution of the construction, the condition of the construction site and the surrounding area, scheduling a meeting for signing a statement of findings establishing the suitability for acceptance of the construction with act 15; issue of an acceptance certificate; preparation of the documentation for the issuance of a permit for use in accordance with Regulation No 2 of 31 July 2003 on the commissioning of construction works in the Republic of Bulgaria and minimum guarantee periods for completed construction and installation works, facilities and construction sites, including the preparation of a final report under Article 168(6) of the Spatial Development Act and a technical construction passport in accordance with Article 176a of the Spatial Development Act and Article 11 of Regulation No 5 of 2006 on technical construction passports; period for notification and rectification of defects - carrying out monthly inspections and inspections of the work on the site, establishing possible defects, preparation and giving instructions for their rectification; issue of certificate(s) for execution, submission of the archives to the Assignor and preparation of a final report under the contract for exercising construction supervision and performing functions of FIDIC Engineer. The specific activities and the requirements for their implementation are detailed in the tender specifications (OP 1, OP 2 and OP 3), which form an integral part of the procurement documents.
https://app.eop.bg/today/410229
https://app.eop.bg/today/410229
71521000 - Construction-site supervision services
71248000 - Supervision of project and documentation
71300000 - Engineering services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.