-
Published18/09/2024
-
Deadline16/12/2024
-
Awarded30/05/2025
-
Today19/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
4mK profile adjustment EBV3, lot 1 - tunnel and open track: Tunnel, civil engineering, roadway, TA / Kabel (GU), Basel St. Johann - Basel West Text automatically translated in your browsing language Automatically translated
Implementation of the EBV3 gauge on the Basel St. Johann - Basel West line, in tunnels and on the open line. Summarised as follows: • Underground track construction and track construction including slope protection • Construction of temporary perrons • Track and switch construction • Construction of tunnels Kannenfeld (KFT) and Schützenmatt (SMT) • Cable works (disassembly of cables, laying / retraction of new cables) According to the detailed performance description in the submission documents. Text automatically translated in your browsing language Automatically translated
45221000 - Construction work for bridges and tunnels, shafts and subways CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45234000 - Construction work for railways and cable transport systems CVP code deduced from the text of the procedure AI-generated
Type: quality
Description: Zuschlagskriterien
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.