RES umbrella project - support for the development of renewable energy sources in the Słupca Commune - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

RES umbrella project - support for the development of renewable energy sources in the Słupca Commune Text automatically translated in your browsing language Automatically translated

  • Published
    30/10/2025
  • Today
    07/11/2025
  • Deadline
    01/12/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
GMINA SŁUPCA
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL414 Koniński
Business sector (Main CPV)
09332000 Solar installation
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Number of lots
2
Tender reference number
RZP.271.1.11.2025.KK
Description

The subject of the contract are installations of renewable energy sources systems for residents of the Commune of Słupca. The subject of the contract was divided into the following lots: 1) Part 1 – ‘Photovoltaic installations and energy storage facilities for residents of the Commune of Słupca’ 2) Part 2 – ‘Performance of heat pump installations for residents of the Commune of Słupca’ In the scope of Part 1 of the contract: the Contractor shall be responsible for: a. the entire task, i.e. the implementation of the material scope carried out in the Commune of Słupca, including works that will be carried out in the design and build formula, related to: - development of comprehensive, multi-industry design documentation covering all works specified in the functional utility programme for the supply and installation of photovoltaic installations and photovoltaic installations together with energy storage for residential buildings, - execution of photovoltaic installation or photovoltaic installation with energy storage, - execution of additional works specified in the functional utility programme for the supply and installation of photovoltaic installations and photovoltaic installations together with energy storage for residential buildings. b. The cost of design documentation may not exceed more than 4% of construction costs. c. The general characteristics of the contract in this part are as follows: The exact material scope of the installation is set out in the annexes to the FTZ. Photovoltaic installations – power distribution [kWp] 3,2 kWp – 1 unit 3,6 kWp – 3 units 4,0 kWp – 7 units 4,4 kWp – 1 unit 4.8 kWp – 6 units 5.2 kWp – 5 units 5.6 kWp – 5 units 6,0 kWp – 3 units 6.4 kWp – 2 units 7.2 kWp – 2 units 8.0 kWp – 7 units 8.4 kWp – 1 unit 9.6 kWp – 34 units 10,0 kWp – 1 unit 12.0 kWp – 1 unit Energy storage units – capacity breakdown [kWh] 6 kWh – 15 units 10 kWh – 42 units For Lot 2 of the contract: the Contractor shall be responsible for: a. the whole task, i.e. the implementation of the material scope carried out in the Commune of Słupca, including works that will be carried out in the design and build formula, related to: - development of comprehensive, multi-industry design documentation, covering all works specified in the functional-utility programme for the supply and installation of heat pumps for residential buildings, - modernisation of the heating system, consisting in the change of the currently used heat source in the heating system and/or the preparation of domestic hot water for the installation of heat pumps with a ground or air-water exchanger, - performance of additional works specified in the functional-utility programme for the supply and installation of heat pumps for residential buildings. b. The cost of the design documentation may not exceed more than 4% of the construction costs. c. The general characteristics of the contract in this part are as follows: The exact material scope of the installation is set out in the Annex to the FTZ. Heat pump capacity [kW] – table Ground-level heat pump for hot water and hot water purposes • 8 kW – 3 units • 12 kW – 4 units • 16 kW – 1 unit • 20 kW – 1 unit Air-to-water heat pump for hot water and hot water • 8 kW – 14 units • 12 kW – 19 units • 16 kW – 5 units Detailed Description of the subject of the Order are the Annexes to the FTZ available at https://asystent.postepowania.pl/org/wgpr/org/gmina_slupca/procedures/1963 Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://asystent.postepowania.pl/org/wgpr/org/gmina_slupca/postepowania/1963
Tenders may be submitted
Electronic submission: required
https://asystent.postepowania.pl/org/wgpr/org/gmina_slupca/postepowania/1963
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.