-
Published11/08/2025
-
Deadline15/09/2025
-
Today19/05/2026
Utilities
- indicates text translated automatically in your browsing language
Design Optimization Waiting cymbal Dommel (Pelt)
The subject of the contract concerns the design of optimisation and associated fitting-out measures at the existing Dommel waiting basin located in Pelt (Herenterdijk) The project area is located on the territory of the municipality of Pelt (see map for location under chapter technical provisions). The contract consists of the following subcontracts: • Preliminary draft (including examination, review, evaluation, alignment and integration of possible solution directions within the project area) • Final technical design • EIA screening • Environmental permit dossier • Tender dossier • Land acquisition dossier • Safety coordination design • Security coordination achievement • Topographic measurements • Consultation meetings
https://www.publicprocurement.be/supplier/enterprises/0/tendering-workspaces/publication-workspace-detail/b05d3b02-e5d1-4bd0-b56d-acdf08202707/general
https://www.publicprocurement.be/supplier/enterprises/0/tendering-workspaces/publication-workspace-detail/b05d3b02-e5d1-4bd0-b56d-acdf08202707/general
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.