-
Published10/09/2016
-
Deadline10/10/2016
-
Opening of tenders10/10/2016
-
Awarded21/11/2016
-
Today13/04/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Germany-Recklinghausen: Water-well drilling
Coverage:
11 groundwater monitoring stations DN 80 in the first Aquifers with a depth of approximately 10 m to 15 m,
Rigging points 200 m to 500 m,
General/underground conditions.
The urban development company Recklinghausen mbH (SER) is planning a change of use on the site of the former Trabrennbahn in Recklinghausen. The concept of “housing on water” has been developed for the project.
In view of its long-standing use as a tramway and the suspicion of contaminated sites, a groundwater analysis is to be carried out for the area of the former Trabrennbahn.
Two separate groundwater horizons are to be distinguished in the survey area. The upper aquifer is formed by the low-power, quaternary sands (and silts). It is a pore aquifer. The second aquifer is built on the rock of the upper chalk (Emschermergel).
The planned current studies are intended to cover groundwater in the first. Cover groundwater in the quartary locker rock deposits with the exception of the Emscher Mergel.
The exact definition is subject to the results of a cable and line search to be carried out.
Holes for the installation of the quaternary groundwater monitoring stations (1. Groundwater) shall be ramped with the single core tube and the drill squeeze in the protection of a pipe with an outer diameter ≥ 219 mm in dry drill. A detailed soil statement is required, in particular with regard to organoleptics (optics, odours) and sampling per layer or linear metre (single samples) and packaging in glass containers.
The drillings must, for the most part, be pre-drilled because of a recognisable influence on war.
PEHD filter and insert pipes DN 80 (90 x 5.1 mm) are to be used to extend drilling to groundwater monitoring stations. The extension of the monitoring stations must be agreed with the assessor.
The construction site is located in the district of Recklinghausen-Hillerheide and is bounded to the north by the Blitzkuhlenstrasse. To the east, the site is bordered by commercial businesses and the forest located on the Siemensstrasse. The A2 motorway is located south of the processing area. In the west, the road at the saddle is the boundary of the terrain.
The construction site will be connected and developed via the Blitzkuhlenstrasse and the two roads on the raceway.
Official name: Stadt Recklinghausen
Postal address: Beckbruchweg 33
Town: Recklinghausen
Postal code: 45659
Country: DEU
45262220 - Water-well drilling
90700000 - Environmental services
71350000 - Engineering-related scientific and technical services
90000000 - Sewage, refuse, cleaning and environmental services
71000000 - Architectural, construction, engineering and inspection services
Postal address: Herner Straße 156
Town: Castrop-Rauxel
Postal code: 44575
Country: DEU
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.