-
Published09/09/2025
-
Deadline16/10/2025
-
Opening of tenders16/10/2025
-
Awarded02/02/2026
-
Today17/05/2026
Utilities
- indicates text translated automatically in your browsing language
Development of the Project for the construction of: water supply network with connections in Poznań as part of investment task 3-05-23-134-0 - Poznań - water supply network in ul. Behind the Citadel and performing author's supervision during the implementation phase of works.
The subject of the contract is: Preparation of the Project in accordance with the applicable Construction Law, the Regulation of the Minister of Development and Technology of 20 December 2021 on the detailed scope and form of design documentation, technical specifications for the execution and acceptance of construction works and the functional-utility program (design documentation including land development, architectural-construction and technical design) for the construction of: - water supply network with connections in Poznań as part of investment task 3-05-23-134-0 - Poznań - water supply network in ul. Behind the Citadel, along with obtaining a valid building permit decision appropriate for the task in question (AQUANET S.A. allows obtaining a building permit decision in electronic form. Whether the building permit will be obtained in paper or electronic form remains up to the Contractor's decision) and performing author's supervision during the implementation phase of works performed on the basis of the documentation being the subject of the contract from the date of conclusion of the contract with the Contractor of construction works to the signing of the final acceptance protocol for these works. Detailed requirements for the subject-matter of the contract and all information on design solutions are contained in the attached technical conditions issued by ‘AQUANET’ S.A. constituting the basis for the design. As part of copyright supervision, provision should be made for: 1. for the investment task • Supervision cards with a stay on the construction site – 5 Supervision cards • Supervision cards without a stay on the construction site – 5 Supervision cards in total of all supervision cards 10. If it is necessary to increase the number of stays on the construction site or to increase the number of supervision cards without a stay on the construction site, unit prices from the Agreement for the performance of author's supervision on the above-mentioned tasks will be accepted for settlements, while these prices will be valid for no more than 50% of the number of Supervision Cards with a stay on the construction site and no more than 50% of the number of Supervision Cards without a stay on the construction site presented above. Detailed Description of the subject of the Order is attached as Annex 8 to the FTZ.
https://aquanet.ezamawiajacy.pl
https://aquanet.ezamawiajacy.pl
Type: price
Description: cena całkowita brutto
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.