-
Published30/12/2024
-
Today19/01/2025
-
Deadline30/01/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Ventilation systems Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The House of Photography (Halle Süd) in the Deichtorhallen Hamburg is being fundamentally renovated and rebuilt. _________________________________________________________________________________________________________________________ Ventilation - General preliminary description A total of four air conditioning systems are installed, three of which fall into the area of partial air conditioning systems. For each system, heat recovery is provided in the devices in order to make optimal use of the energy available in the exhaust air. Heat recovery is carried out by means of plate heat exchangers, rotary heat exchangers or circuit-composite systems. The toilet exhaust air is also routed via the plate heat exchanger. The plate heat exchangers receive a continuously controllable summer bypass, which also serves as icing protection. All systems have an ePM1-50% (F7) on the air side and an ePM10-50% (M5) filter according to ISO 16890 on the air side. In addition, the kitchen/restaurant ventilation unit receives a G3 grease trap filter on the exhaust air side, the exhaust air fan motor is encapsulated and externally ventilated. The intake is guided via a suction head mounted on the roof of an elevator cage at ground level in the parking lot, with circumferential weather protection slats. The exhaust air is partly carried out via an exhaust air tower installed in the parking lot and via an exhaust air outlet in a casemate. ------------------------------------------------------------------------------------------------------------------------------------------------------------------ Execution must begin immediately after the order has been placed. The service must be completed by 06.05.2027 at the latest. Text automatically translated in your browsing language Automatically translated
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/deeplink/subproject/0a86030d-5580-4bd7-94b7-54c75e0dc034
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/deeplink/subproject/0a86030d-5580-4bd7-94b7-54c75e0dc034
45331210 - Ventilation installation work
42510000 - Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.