-
Published13/01/2025
-
Deadline10/02/2025
-
Today27/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Two (2) 110 kV GIS systems with single busbar, each consisting of feed-in field and two outlet fields, including protection and control technology, for the HKW Mitte (project SGM) Text automatically translated in your browsing language Automatically translated
In order to cover the future additional heat demand in Berlin, the construction of a new additional heat generation plant with a district heating capacity of 120 MWth in the HKW Mitte is necessary. Part of the overall project is the pre-order of 2 (two) 110kV GIS systems. This procurement project includes the planning, production, delivery of DDP HKW centre in accordance with Incoterms 2020, discharge, assembly, final acceptance including approval for external connection, installation and commissioning of two (2) 110 kV GIS systems (without SF6 [GWP < 1000]) with a short-circuit resistance of 40kA (sec) , in the single busbar design, each consisting of a feed-in field and two outlet fields. The control and protection technology associated with the field and systems must be supplied in separate secondary technology cabinets. Text automatically translated in your browsing language Automatically translated
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/deeplink/subproject/8fa22408-4abd-409c-90c3-2027cec8cc72
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/deeplink/subproject/8fa22408-4abd-409c-90c3-2027cec8cc72
45315700 - Switching station installation work
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.