‘Engineering, design, design supervision and construction of “Construction of a drainage collector and deep-water discharge after the Albena WWTP” under the FIDIC contract conditions – Yellow Book, 1999’ Text automatically translated in your browsing language Automatically translated
The designated Contractor shall carry out the activities included in the scope and description of this documentation, namely: Review and analysis of the available project documentation for the planned activities, as well as its alignment with the current Bulgarian standards for design and construction, the Spatial Planning Act and the secondary legislation for its implementation; Preparation of an investment project in the technical design phase for the site ‘Construction of a drainage collector and deep-water discharge after the Albena WWTP’ Dobrich region, in accordance with Regulation No 4 of 21 May 2001 on the scope and content of investment projects, the Spatial Development Act and the secondary legislation on its implementation; Coordination of the project with all control bodies, operating companies and institutions in accordance with the requirements of the regulatory framework; Obtaining all necessary opinions and permits according to the Bulgarian legislation; Ensuring the assessment of the compliance of the investment project; Obtaining a building permit and lawful commencement of construction; Execution of construction - installation works and any other accompanying and related activities necessary for the execution of the construction, in accordance with the regulatory requirements, the requirements of the Contracting Authority, the drawings and tables; Implementation of author's supervision under the Spatial Development Act, technical solutions, additions and amendments to the project, technological control and assistance in putting the site into operation; Preparation of executive documentation, cadastral recording of the entire site and submission to the relevant office of geodesy, cartography and cadastre of data in accordance with Article 175(5) of the Cadastre and Property Register Act; Submission of the Site and its acceptance by the Assignor, by act Model 15 under Regulation No 3 of 31 July 2003 on the drawing up of acts and protocols during construction and Certificate of Acceptance by the Engineer; Samples after completion; Entry of the site into operation with Protocol Template 16 under Regulation No 3 of 31 July 2003 on the drawing up of acts and protocols during construction (without the issuance of Template 16 being included in the completion time); Period for reporting and removal of defects - reaching the design parameters and assisting the personnel in the operation and maintenance of the newly built elements of the site; removal, at the expense of the Contractor, of defects found. The specific activities, as well as the requirements for their implementation, are detailed in the Technical Specifications, which form an integral part of the procurement documents. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/452962
https://app.eop.bg/today/452962
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.