-
Published17/04/2024
-
Deadline17/05/2024
-
Today29/09/2026
Utilities
- indicates text translated automatically in your browsing language
3-field sports hall Feuerbach | Stuttgart
The district of Feuerbach enjoys a high popularity of the population in the area of club sports as well as individual leisure sports. However, the clubs and organisations based there cannot meet the need for training times over the current hall stock. For this reason, a municipal sports hall will be built right next to the existing “vitadrom” of the Feuerbach Sports Association in the Wilhelm-Braun-Sportpark. The designated sports hall is intended in particular for school, club and leisure sports, as well as for use for competitions of local clubs. The construction project is not covered by the Assembly Facilities Ordinance. The new building will include a 3-divisible sports hall (1.215 m²) with 199 spectators and optionally a well-usable gymnastics room (90 – 160 m²). It should also allow competitive use for all common sports. This also includes a sales opportunity for drinks and small food offerings. The arrangement of the functions should be made as compact and area-efficient as possible. In addition, emphasis is placed on simple and intuitive usability. According to a feasibility study preceding 2021, the existing site will be exceeded by the planned new building. This exceedance is permissible through an exemption regime, but must be compensated by measures of building greening (roof greening and facade greening) and greening in the outdoor area between the extension and the sports hall. The necessary car and bicycle parking spaces are to be created in the immediate vicinity of the sports hall. Construction costs are estimated at around EUR 8.59 million net (cost group 300, 400 and 500). As part of the VgV process with solutions, a team of architects and landscape architects will now develop a coherent planning concept for the sports hall. The state capital of Stuttgart will carry out the project using the BIM methodology. The planning teams must also have a professional qualification in BIM and undertake to carry out the project in accordance with BIM requirements. The detailed performance picture can be found in the attached model contract incl. annex (AIA).
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
Type: quality
Description: - Personelle Projektorganisation 10 % - Qualifikation und Erfahrung des betrauten Personals, insbesondere der Projektleitung (Hochbau) 10 % - Vorgehensweise anhand des erarbeiteten Lösungsvorschlags (Vorstellung präferiert durch Projektleitung) 45 % - Beantwortung der Fachfragen 15 %
Weight (percentage, exact): 80
Criterion:
Type: price
Description: Honorarparameter (Honorarangebot) 20 %
Weight (percentage, exact): 20
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.