Published12/07/2024
-
Deadline20/08/2024
-
Opening of tenders20/08/2024
-
Awarded12/09/2024
-
Today10/12/2024
Utilities
- indicates text translated automatically in your browsing language
Renovation of the provincial road No. 843 Wólka Kraśniczyńska – Majdan Skierbieszowski from km 28+700 to km 29+900 – length: 1,200 km Text automatically translated in your browsing language Automatically translated
2. The basic material scope and number of works are specified in the attached Bill of Quantities, Technical Project. 3. The Contractor is obliged to ensure safe road and pedestrian traffic conditions in the area of the works covered by the contract on the basis of a temporary traffic organization (for the duration of the works) approved by the Traffic Manager on provincial roads. 4. The works must be carried out in accordance with the requirements set out in the attached Technical Specifications for the Execution and Acceptance of Construction Works, Technical Project. 5. The study covered the renovation of the section of the provincial road No 843 located in the built-up area on the section Stara Wieś – Wólka Kraśniczyńska from km 28+700+470 to km 29+900, with a length of 1,200 km, in order to repair and strengthen the existing asphalt-concrete road surface. The scope of works is (part III) renovation works covered by the Technical Project entitled: ‘Renovation of provincial road No 843, section St. Wies – Majdan Skierbieszowski from km 26+470 to km 31+470 - length: 5,000 km’ – Application accepted without opposition by the Lublin Provincial Office in Lublin in accordance with Certificate ref. IF-I.7843.5.5.2021.ZS of 22 January 2021. 6. The work will consist of: Local milling - up to a depth of 2.5 cm is designed to eliminate deformations in the transverse and longitudinal profile on the inclusions in this; local hunches along the road, and between wheel tracks and at the edge of the carriageway. Restoration of the transverse and longitudinal profile of the road will be achieved together with its planned reinforcement in understatements and in the tracks of the wheels through local rutting, incorporation into the equalization and then incorporation into the binding and abrasive surface and hardening of the shoulders with aggregate. No correction is foreseen in the existing pavement profile. 7. The planned scope of works is aimed at restoring the original parameters of the road, to obtain: a) width of the carriageway 6,00m, cross-section with widenings on the horizontal curves of the road, b) lateral slopes of the carriageway: 1.5 to 2% on straight sections and variably up to 3.5% on road curves, c) lateral slopes of shoulders up to 4 to 6% 8. For this purpose, the basic material scope of the works will be carried out as follows: 1) Corrective milling of the surface - 8 939,80m2 2) Execution of the trough (under the technological band) at the edge of the carriageway - 720,00m2 3) Earthmoving works carried out with submersible excavators in the ground cat. I-II with transport of excavated material - 30,00m3 4) Technological band - support and reconstruction of the edges of the roadway made of C16/20 concrete and aggregate surrounded by bitumen - construction of a foundation at the roadside gr.25cm (mixed concrete C16/20) - 720,00m2 - construction of a foundation made of AC-16W mixture - gr. 5,0cm. - 720,00m2 5) Alignment of the foundation with the mixture AC-16W min. thickness 2.0cm (dia. 4,0 cm) - 893,98 Mg 6) Mechanical cleaning and condensation of the surface - 7200,00m2 7) Laying of anti-crack nets with a minimum tensile strength of 100kN - 7080,00m2 8) Making a binding layer gr.6 cm of mineral-bituminous mixture AC16W - 8 939,80m2 9) Making an abrasive layer of 4 cm of mineral-asphalt mass AC11S (fine and thick basalt or granodiorite aggregate) - 8 794,00m2 10) Mechanical side profiling with the formation of the trough - 1 440,00m2 11) 60/grub.0,15m) - 1440,00m2 12) Mechanical shoulder profiling - 2 880, 00m2 13) Restoration, desilting of ditches - 2 020,0m 14) Restoration of culverts under slopes (on a gravel foundation bench) - 1/9m 15) Disassembly and setting of new U-1a,U-1b, U7, U-8,U-3 posts - 67,00pcs. 16) Horizontal marking of the surface - 325,00m2 9. The scope of work includes basic works. The detailed material scope of the works is included in the bill of quantities. For the duration of the works in the DW 843 road lane, a temporary traffic organization project will be introduced allowing for the shuttle movement of vehicles. 8. The Contractor is obliged to ensure the management of the Works covered by the Contract, for as long as it is necessary, by persons who are qualified and meet the requirements set out in the Construction Law. Failure by the Contractor to secure personnel to manage the works gives the right to the Supervision Inspector or the Contracting Authority to suspend the works in whole or in part. Any interruption in the performance of the Works resulting from the lack of staff to manage the works will be treated as an interruption occurring for reasons attributable to the Contractor and cannot constitute a basis for changing the time to complete the works. 9. The bill of quantities for the works covered by the contract shall be of an ancillary nature and shall specify the minimum quantities of basic works necessary for the execution of the contract. The possible absence of certain works necessary to be carried out on the basis of the design documentation in the bill of quantities or in the offer cost estimate does not release the contractor from the obligation to carry them out on the basis of the design at the contractual price. 10. As part of the contractual remuneration, the Contractor is obliged to: "- to ensure the share of electric vehicles or natural gas vehicles in the fleet of vehicles used in the performance of the public task in question, in the share specified in Article 68 para. 3 of the Act of 11 January 2018 on electromobility and alternative fuels (Dz. Journal of Laws 2023, item 875, as amended), having regard to Article 36a, which lays down the rules for the rounding of percentages when calculating the number of vehicles required, in so far as the performance of a public task requires the use of motor vehicles. The specific number of vehicles will be indicated by the Contractor at the stage of signing the contract.’ 11. Whenever the description of the subject-matter of the contract is described by means of standards, the contracting authority shall allow solutions equivalent to those described, it shall be assumed that each reference to technical specifications and standards is accompanied by the words ‘or equivalent’. 12. The contract (construction works) performed by the Contractor will be covered by the warranty for the period of time resulting from the submitted offer (in accordance with point. XIX SWZ). Text automatically translated in your browsing language Automatically translated
https://zdw-lublin.logintrade.net/zapytania_email,170380,f679c130bcefdee7ab4007238199b0b8.html
https://zdw-lublin.logintrade.net/zapytania_email,170380,f679c130bcefdee7ab4007238199b0b8.html
Postal address:
Town: Sitno
Postal code: 22-424
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.