-
Published13/06/2025
-
Deadline14/07/2025
-
Today19/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
SV-MAL-250313-005 HKW Nord Execution of a large revision on the turboset block 3 Text automatically translated in your browsing language Automatically translated
provision of services and supplies to carry out a major overhaul of a 27 MW steam turbine manufactured by BBC; Type Borsig/ 3-bearing. The turboset consists of the extraction condensation turbine and a directly coupled generator. The scope of services includes: 1. Complete disassembly of the machine 2. Assessment and implementation of zfP to determine the scope of repair 3. Repair of the relevant components/assemblies 4. Reassembly to functional unit 5. Start-up of the turbine Text automatically translated in your browsing language Automatically translated
https://www.swm.de/einkauf/bekanntmachungen
https://www.swm.de/einkauf/bekanntmachungen
42112000 - Turbine installations CVP code deduced from the text of the procedure AI-generated
42110000 - Turbines and motors CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Preis (Wertungssumme)
Weight (percentage, exact):
Criterion:
Type: quality
Description: Technischer Wert
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.