Demolition of the building complex Möbelwerk Wurzbach Text automatically translated in your browsing language Automatically translated

  • Announced
    13/03/2025
  • Estimated published
    18/03/2025
  • Today
    21/04/2025
Status
Announced
Type of contract
Works
Subject for Renewal
No
Buyer
Stadt Wurzbach
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEG0K Saale-Orla-Kreis
Business sector (Main CPV)
45110000 Building demolition and wrecking work and earthmoving work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

BV Abbruch Möbelwerk Wurzbach - Pre-announcement Lot 1 – Demolition of the building complex Möbelwerk Through the city of Wurzbach, it is planned to clear, gut and then completely demolish the former furniture factory in Leutenbergerstraße 36, in Wurzbach. The former furniture factory is located about 700 m north of the city center of Wurzbach. Immediately east of the site runs the pre-flood Sormitz. The company premises are directly connected to the main road B90, which is marked in the city area as Leutenbergerstraße. The services mainly include: 1 social building 2-storey solid building with extended attic, basement, gable roof and dormers as a wooden structure with slate covering, false ceilings reinforced concrete / brick, floor screed or with wood screed, external walls brick with plastered HWL panels, internal walls masonry or lightweight panels (plasterboard), 1 oil cellar with fuel oil tanks approx. 3,800 m3 2 Production hall I 1-storey support and bar construction, gable roof Wood construction with roofing board, corrugated asbestos and sheet metal covering, suspended ceilings with asbestos slab cladding and insulation support (Piatherm), reinforced concrete floor, external walls Masonry 2,150 m3 3 Production hall II 1-storey support and bar construction, gable roof wooden construction with corrugated asbestos and sheet metal covering, suspended ceilings with asbestos slab cladding and insulation support (Piatherm / Styrofoam), reinforced concrete floor, external walls masonry 4,600 m3 4 connecting construction 2-storey support and bar construction, flat pent roof wooden construction on concrete with roofing board covering, not basement, false ceiling and floor reinforced concrete, external walls masonry 3,700 m3 5 main building 3-storey solid construction, gable roof wooden construction with roofing, not basement, false ceilings and floor reinforced concrete / MW, external walls masonry, 1 elevator installation (h approx. 16 m), 1 staircase (h approx. 16 m), 1 roofing with sheet metal roof on steel girders 11,700 m3 6 Administration 2-storey solid construction with extended attic, basement, crippled whale roof wooden construction with slate covering, false ceiling ground floor and floor reinforced concrete / MW, false ceilings 1. Upstairs to DG Wooden construction with wooden floorboards, external walls Masonry Renovated room: ca. 2,200 m3 7 Boiler house 2- and 3-storey solid construction, saddle and lectern roofs Wood construction with roofing board or corrugated stone covering, not basement, false ceilings and floor reinforced concrete/ MW, external walls masonry/ lightweight concrete, partly with PAH-containing horizontal barriers approx. 3.700 m3 8 Residential house/villa 2-storey solid construction with extended attic, basement (several vaulted cellars), gable roof wooden construction with bitumen shingles, false ceiling EC and floor reinforced concrete/ MW with wooden floorboards, false ceilings DG to wooden construction with wooden floorboards, stucco ceilings, plaster plasters with straw inlays, external walls masonry partly with PAK-containing horizontal barriers 2,250 m3 9 Warehouse construction yard (not included in the demolition and disposal concept) 1-storey solid construction in reinforced concrete skeleton construction, masonry with concrete formwork and mixed masonry, reinforced concrete floor slab, false ceiling with 1-layer wood fibre slab covering, wood binder roof construction with corrugated stone covering 4,050 m3 The building demolition must initially be carried out except for OK floor slabs / foundations. The remaining components and soils are then sampled (examination of contaminated sites). After evaluation of the test results, a separate invitation to tender for the remediation of contaminated sites is issued. Building materials sampled as pollutant-free can be broken off/discarded after appropriate evaluation via the positions described in this measure. Text automatically translated in your browsing language Automatically translated

Submission Method
Not available
Tenders may be submitted
Not available
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
CPV code

45110000 - Building demolition and wrecking work and earthmoving work

45400000 - Building completion work CVP code deduced from the text of the procedure AI-generated

45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated

Award method
Not available
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.