-
Published15/01/2025
-
Deadline14/02/2025
-
Opening of tenders14/02/2025
-
Awarded13/03/2025
-
Today20/12/2025
Utilities
- indicates text translated automatically in your browsing language
Replacement of two disc filters of sub-plant 2 of the Schlema-Alberoda water treatment plant Text automatically translated in your browsing language Automatically translated
The two Mecana MSF 8/40 disc filters used so far (built in 2000) are located in the process engineering sequence of sub-plant 2 between the settling tanks and the distribution structure and have been in use since 2000. Since sub-plant 2 was commissioned in 2000, approximately 77 million m3 of flood water has flowed through the two disc filters. As a result of the previous load and the progressive corrosion, the filters have reached the technical durability. In order to ensure further plant operation until at least 2050, it is necessary to replace the two disc filters with identical units. The new disc filters must be installed in the existing filter structures in order to ensure the further process engineering process. Text automatically translated in your browsing language Automatically translated
http://www.subreport.de/E44343444
http://www.subreport.de/E44343444
Type: price
Description: Preis
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.