Canceled10/09/2026
-
Today09/10/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Partial replacement of protective and control technology in the four 110-/10-kV substations Gelnitz, Tegel, Rüdersdorfer Straße and Laufner Straße (lots 1-6)
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
As part of the network expansion and the guarantee of security of supply in the state of Berlin, Stromnetz Berlin GmbH intends to replace a total of 4 substations (UW Tegel, UW Rüdersdorfer Straße, UW Gelnitzstraße and UW Laufner Straße). The 4 substations are Type 14 ring substations (i.e. each substation has 3 110 kV switchboards) built between 1994 and 1997. Scope of services per lot: - Project coordination - Control technology - Protective technology - Own use - TGA electrical - Primary technology - Circuit technology General and technical specifications for the individual lots can be found in detail in sub-installation C - Technical tender documents.
45317300 - Electrical installation work of electrical distribution apparatus
51112000 - Installation services of electricity distribution and control equipment
31210000 - Electrical apparatus for switching or protecting electrical circuits
31200000 - Electricity distribution and control apparatus
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.