Published04/06/2025
-
Deadline30/06/2025
-
Opening of tenders30/06/2025
-
Today10/07/2025
Utilities
- indicates text translated automatically in your browsing language
New building BT IVA as extension to BT IIIA - Campus Mügelsberg - Property Planning Building (architect) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The new school building is to be built in Stb- wood hybrid construction. It is a four-storey building with a flat roof. The basement rises half a storey from the ground in the south, which then rises to the north. The detailed information on this can be found in the enclosed planning documents. The basement is based on a tr-floor slab. At the two ends of the building there are massive reinforced concrete cores on all floors. In the basement, walls and columns are made of reinforced concrete. The walls and ceilings above, located between the massive cores, are to be built in skeleton construction in Stb-wood hybrid construction. The columns are made of wood and the floor slabs are made of a grid of prefabricated wood-concrete composite elements. Axle dimensions and heights can be found in the planning documents, as well as the floor plan divisions. In terms of fire protection, the building is divided into two sections, see fire protection concept. All other information can be found in the planning documents. The new building can be connected via the existing supply lines of the existing building. The disposal lines were coordinated with the ZKE. The floor plans have two solid cores made of reinforced concrete at the end of the building, in which the stairwells, the toilet facilities and parts of the technology are located. Between the fixed cores are the classrooms with traffic area. Here, the classrooms can be used conservatively as classes or via mobile partitions in conjunction with the corridors as a cluster, see the following scheme. In total, thirteen new classrooms will be created. The building must be built as a climate-friendly non-residential building according to KFW No.498/499. To this end, the following must be achieved: - Efficiency building 40 will be built. - The "Quality Seal Sustainable Buildings (QNG) Plus with regard to greenhouse gas emissions must be fulfilled. - Heating via oil, gas or biomass is not permitted. The following documents are enclosed with the invitation to tender and must be observed: - Cadastre plan - Approval planning Site plan M 1:250 - Approval planning Ground floor with open space design M 1:100 - Approval planning UG, 1.OG, 2.OG M 1:100 - Approval planning Views M 1:100 - Approval planning Cross-section and longitudinal section M 1:100 - Area calculation according to DIN - External perspective with facade example Greening - Fire protection concept This is a measure within the framework of the "Community task of improving the regional economic structure" (GRW funding). This must be taken into account at all times of the action. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4DA65F3J
https://www.dtvp.de/Satellite/notice/CXP4DA65F3J
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.