-
Today12/05/2026
Utilities
- indicates text translated automatically in your browsing language
Electrical planning ⁇ Extension building at Kinderhaus Bühl
The university city of Tübingen is planning to build an extension at Kinderhaus Bühl in Weilenburgstraße 30 in Tübingen Bühl. The existing 2.5-group day care center is to be extended to 5 groups (2x U3 + 3x Ü3 GT) and a total of 90 childcare places. For this purpose, the existing single-storey existing building (approximately 370 m2 net floor area) (built in 1997, timber construction with a flat pitched gable roof) is to be extended by an extension and/or, if necessary, by an increase (approximately 470 m2 net floor area in total). The rooms of the Protestant church (included in the 370 m2 inventory) attached to the existing day care facility were purchased by the city and can be reused for the day care center in the future. The extension building is to be realized in wood construction, possibly for static and / or fire protection reasons in wood hybrid construction, with prefabricated elements. The planning plot includes the parcels 1138 (children's house inventory), 1138/3 (church rooms) and 1134 (garden / green area, approx. 750m). The total land area is just under 2,760 m2. The detailed description of the construction project and the installations such as the site plan, the existing floor plans, the feasibility study, the spatial programme, the energy guideline of the city of Tübingen, sustainability criteria of the state of Baden-Württemberg, etc. can be found in the procurement document No 2 - project description and annexes to VU No 2. The contracting authority has estimated a gross budget of EUR 4 million for the entire project. This is what the planning has to be based on. Estimated eligible net manufacturing costs for the extension construction in cost group 300 approx. EUR 1,760,000. Estimated eligible net manufacturing costs for the extension construction in cost group 400 approx. EUR 586,500. Of these, net manufacturing costs of approx. EUR 282,000 have been calculated in plant groups 4+5. The two cost groups are grouped into fee zone II. Start of planning services Lph 1 and 2 in September 2024 Start of construction at the beginning of September 2025 Acceptance/handover at the end of 2026
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.