CH-Zollikofen: Electricity distribution and control apparatus

  • Published
    20/12/2012
  • Deadline
    08/03/2013
  • Today
    27/09/2026
Status
Submission closed
Type of contract
Supplies
Subject for Renewal
No
Buyer
SBB Infrastruktur Einkauf, Supply Chain und Produktion Einkauf Bauprojekte
Place of performance
NUTS code: Not available
Location of buyer
NUTS code: Not available
Business sector (Main CPV)
31200000 Electricity distribution and control apparatus
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

Content of the project The new substation will be built in Hurlistein, between track installation and forest belt. It will ensure the transformation and supply of the Grüze-Seebach transmission line (132 kV) to the contact line (15 kV) into traction current. This project will comply with the new standard UW2012. The construction will contain two transformers with a power output of 21,7 MVA and 15 kV, 132 kV and 16.7 Hz distribution installations respectively.
Scope of the service The service, which includes, in particular, the planning of performance, must be carried out entirely by a total contractor. All the services required for turnkey commissioning of the substation, including the supply of 132 kV (from the 132 kV end mast), the supply of the 15 kV contact line (up to the mooring gate included in the construction area of the substation) and the fitting-out of the surrounding area, must be carried out by this contractor.
These services include: – project management by the contractor totaly- the coordination of the steps with the authorities – the dimensioning and design of the substation on the basis of the indications provided – the detailed study of the project and the engineering skills necessary for its operation- the manufacture or purchase and assembly of the components and parts required – the constructions, including all technical installations – the installation of primary and secondary elements, as well as the building including the technical installations of the mountain- the configuration and the installation of the components to be connected to the site, all of which are connected to it.
— The construction works will run from January 2014 to the end of October 2015.

Submission Method
Not available
Tenders may be submitted
Submission for all lots
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Not available
Award method
The most economic tender
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.