-
Published11/09/2024
-
Deadline08/10/2024
-
Today19/04/2025
Utilities
- indicates text translated automatically in your browsing language
Nativity scene extension KiTa Eschenried - Landscape architecture Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
As part of the VgV procedure, a landscape architecture office for the nativity scene extension of the KiTa Eschenried is to be determined. Information on the day-care centre: The partially cellared KiTa Gottlieb-Daimler, Hinterweiler Straße 54 in Sindelfingen was built in 1962. The stock has been partially renovated in recent years. In the KiTa, two groups of 25 children aged 3-6 are currently being cared for. The outdoor facilities are generously sized. The existing building is conveniently located in the plot for an extension, which is also possible under building law. The outdoor areas are a garden with play areas, which mainly dates back to the founding time of the daycare center. In addition to the classic play areas with mainly wooden outdoor play equipment (which have been replaced over the years), there are paths and squares, a swimming pool made of reinforced concrete and a fence made of wooden slats with care gates. These facilities are to be modernised, adapted to changing climatic conditions and, if necessary, separated by age groups (U3 areas). Existing old trees must be protected and integrated into the planning. If necessary, the external drainage must be adapted to the requirements of the flood whitening. Sun protection in outdoor areas is of particular importance. If necessary, parking spaces for cars and bicycles should be made. The entrance area of the daycare centre has to be redesigned. The construction measures are carried out during ongoing KiTa operation. In the implementation, attention should be paid to sustainable and economical construction methods in order to make a contribution to climate protection. The currently valid guidelines for barrier-free construction must be observed and complied with. The gross costs for the construction work of the KGR 500 amount to approximately EUR 430,000 net. Estimated schedule: from 2nd quarter 2025 planning services stage 1 (Lph 1-3), from 4th quarter 2025 planning services stage 2 (Lph 4-7), from 4th quarter 2026 start of construction (start stage 3 / Lph 8), end of 2027 completion. Inventory documents will be made available to candidates in the second phase of the procedure. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E76233188
https://www.subreport.de/E38429858
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.