-
Awarded17/01/2024
-
Today18/09/2026
Utilities
- indicates text translated automatically in your browsing language
Heating systems and central water heating systems
Construction and installation of heat supply installations for the construction of a new hospital building within an existing situation. 2 St heat transfer stations steam/water, power 700 kW; 1 St steam boiler, Niro 550 kg/h; 1 St condensate return plant, 1.500 l; 2 St hot water heating, up to 750 litres; 30 St wet-run pumps up to 30 m³/h; 150 steam taps up to DN 100, of Sphärogus; 60 steam fittings up to DN 80, in cast stainless steel; 200 St heating taps up to DN 125, in grey cast iron; 800 m steam, black steel tube, DN 15 to DN 125; 500 m steam, stainless steel tube, DN 15 to DN 80; 7 000 m heating, black steel tube, DN 15 to DN 100; 260 St steel tube radiators; 7 t steel construction and grating platforms. Operate the entire installation before and after the VOB acceptance until it is handed over to the operator approximately 9 months.
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.