Published24/08/2026
-
Today10/09/2026
-
Deadline21/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
New building Martin-Niemöller-Gesamtschule-VE3.4 Facade window + PRF + exterior doors
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Facade works - MNGES VE 3.4 Facade windows + PRF + external doors Description of the measure The present construction project is the new construction of the Martin-Niemöller-Gesamtschule in Bielefeld. The planned area extends to a northern and a southern plot of land with buildings to be erected thereon: BA Süd Building plot size: 8,995 m2 maximum floor area: approx. 3,457 m2 (basement floor) Gross capacity: 37,674 m3 (category R) Gross floor area: approx. 7,128 m2 (category R) Max. height OK Attica: 14,75 m BA Nord Building plot size: approx. 11,960 m2 maximum floor area: 7,549 m2 (basement floor) Gross capacity: 89,887 m3 (category R) Gross floor area: 16,927 m2 (category R) Max. height OK Attica: 21,80 m Type of service The VE3.4 facade works windows, post-bolt facades and external doors include comprehensive facade work on the south and north sections of the Martin-Niemöller-Gesamtschule project in Bielefeld. The scope of services of the Contractor in the construction phases includes, among other things, plant planning, production, delivery and assembly as well as commissioning and maintenance of: - Single window elements and coupled hinged window systems made of wood-aluminium - Insert windows Aluminium, - Post-bolt facades in wood-aluminium, - Metal cladding Lisenen and window sills, - Exterior door systems Aluminium and wood-aluminium as well as their accessories, - Sun shading, glare protection and darkening systems. The start of execution takes place 12 days after the order has been placed with the preparation of the plant and assembly planning. According to the preliminary construction schedule, the following milestones/target dates are envisaged for the assembly work: BA South: - EG-2.OG (all floors), building envelope dense: KW 13 2027, - Completion of facades (lenses, window sills, sun protection): KW 28 2027, - Subsequent installation of facades/external doors in bauzeitl. Insertion openings: Fourth quarter of 2027. BA Nord: - Ground floor, building envelope tight: KW 17 2027, - 1st floor, building envelope tight: KW 23 2027, - 2nd floor, building envelope tight: KW 29 2027, - 3rd floor (library), building envelope tight: KW 32 2027, - 4th floor (library), building envelope tight: KW 35 2027, - Completion of facades (lenses, window sills, sun protection): KW 50 2027, - Subsequent assembly of facade types in bauzeitl. Insertion openings: Q2 2028, Qualifications AN performing welding work in the workshop or on the construction site must prove their suitability. The proof shall be deemed to have been provided if the exporting company is in possession of the manufacturer's qualification for execution class EXC2 in accordance with DIN EN 1090-2 and the associated recognition in accordance with DIN EN ISO 3834-3 or 3834-2. Proof of all the necessary qualifications must be submitted with the submission of a tender. Location of the construction site The two areas are bounded to the west by the Apfelstraße and separated by the street "An der Reegt". The tenderer is advised to inspect the building area/building plot on his own responsibility before submitting a tender in order to create a basis for calculation.
https://www.vergabe-westfalen.de/VMPSatellite/notice/CXX0YYDYTTQAY8BD
https://www.vergabe-westfalen.de/VMPSatellite/notice/CXX0YYDYTTQAY8BD
45223220 - Structural shell work
45400000 - Building completion work
45214000 - Construction work for buildings relating to education and research
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.