-
Published22/08/2025
-
Deadline22/09/2025
-
Opening of tenders22/09/2025
-
Today18/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Reconstruction of existing school building and construction of a one-field sports hall - steel construction and locksmith work
The municipality of Bietigheim/Baden is planning the conversion and expansion of the existing 3-storey school building, with basement in a 3-storey primary school with new construction of a canteen/event area, as well as a one-field sports hall. The old building and the caretaker's building were examined with regard to pollutants. A renovation on this basis takes place on site before the start of the actual construction project. In the same train, the caretaker building and the eastern entrance block are completely demolished. Inside the existing building, the complete gutting and demolition of the wooden roof truss takes place. The existing building receives an annex on the east and west sides with additional classrooms on the 1st + 2nd floor. These extension buildings are designed to be statically effective with regard to the reinforcing of the old building. On the east side to the Tullastr. a single-storey extension is built, which includes the new canteen including a regeneration kitchen, as well as in extension the main entrance with event room, as well as the Einfeldsporthalle with its adjoining rooms. The steel construction and locksmith work includes, among other things, the production and assembly of railings in the exterior and interior (e.g. best. Main staircase). Primarily, these are steel frame railings with an insert filling made of VA diamond mesh, which are clamped and used in a VA frame made of QR. In addition, simple flat steel railings consisting of handrail, knee bar and railing post are to be produced outdoors. On the south side of the old building, a 2-storey escape balcony with 2 single staircases is being built over the entire length of the building as a steel structure. The pavings and stair steps consist of grating surfaces. The entire construction is placed on concrete foundations on site and must be erected and stiffened without connection to the building. Also on the south side is a garbage house with bicycle parking spaces made of reinforced concrete. The enclosure of the garbage house is made of sliding doors and fixed elements, which consist of a tubular steel frame with sheet metal planking made of corten steel and special perforation. The existing light shafts of reinforced concrete remaining on the old building must be adapted to the new terrain upper edge by means of an additional steel structure with grating cover. In the interior of the basement, steel doors with and without fire protection requirements must be installed.
https://www.subreport.de/E16211789
https://www.subreport.de/E16211789
45210000 - Building construction work
45214000 - Construction work for buildings relating to education and research
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.