-
Announced22/04/2025
-
Today18/05/2025
-
Estimated published16/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Design and construction of new connecting road Vathorst Text automatically translated in your browsing language Automatically translated
The municipality of Amersfoort intends to build a new connecting road of approximately 3 kilometers, including an underpass at the level of the Zevenhuizerstraat and an adjustment of the entrance and exit A1 at Bunschoten. The road must form a high-quality connection between the Vathorst district and the N199 and the entrance and exit of the A1 motorway and also serves to connect the new Bovenduist district. The municipality of Amersfoort intends to build a new connecting road of approximately 3 kilometers, including an underpass at the level of the Zevenhuizerstraat and an adjustment of the entrance and exit A1 at Bunschoten. The road must form a high-quality connection between the Vathorst district and the N199 and the entrance and exit of the A1 motorway and also serves to connect the new Bovenduist district. The contract will be awarded as a two-stage contract and will consist of the following main elements: Phase 1 * Project management - Quality management - Integral safety management * Project management - Scope management - Planning management - Financial management incl. drawing up an estimate - Risk management - Document management * Contract management - (Joint) drawing up contract documents for the execution (UAV-gc) * Environmental management - Optimal integration of environmental requirements into the design - Creating support for the design - Drawing up SES on the basis of KES - Obtaining permits / permissions - Conducting studies (conditioning) and processing the results of studies in the design - Communication - Stakeholder management, including with the four road authorities involved (Municipality of Amersfoort, Municipality of Bunschoten, Province of Utrecht and Rijkswaterstaat) * Technical management - Drawing up preliminary design and final design - Drawing up V&G design - Coordinate work third parties - Conducting the necessary investigations - Preparation of cables and pipelines. Phase 2 * Project management - Quality management - Integrated safety management * Project management - Scope management - Planning management - Financial management - Risk management - Document management * Environmental management - Obtaining permits - Environmental communication - Traffic management - Flora & fauna - Archaeology - Explosive remnants of war * Technical management - Drawing up implementation design - Preparatory work - Implementation work . Realize connecting road including landscape integration, connections (including the connection to the N199 and the A1), flora and fauna measures, verges, water storage, signage, etc. . Realize underpass Zevenhuizerstraat . Establishing a free cycle path . Realisation of soundproofing . Realizing public lighting - Verifying and validating (V&V) - Finishing and delivering to the four road authorities involved (municipality of Amersfoort, municipality of Bunschoten, Province of Utrecht and Rijkswaterstaat) - Regular maintenance. Text automatically translated in your browsing language Automatically translated
45233120 - Road construction works
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.