Electrical engineering services for the construction of a substation

  • Published
    10/08/2026
  • Deadline
    24/08/2026
  • Today
    04/09/2026
Status
Submission closed
Type of contract
Services
Subject for Renewal
No
Buyer
SWE Netz GmbH
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEG01 Erfurt, Kreisfreie Stadt
Business sector (Main CPV)
71323100 Electrical power systems design services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
N005-2026
Description

As the grid operator of the state capital Erfurt, SWE Netz GmbH is responsible for the safe and reliable operation of the power distribution networks. One of the tasks is to adapt the high-voltage grid (110 kV grid) to the increasing energy demand of the grid customers due to various influencing factors, and if necessary to expand and upgrade it. Several influencing variables act in parallel, but largely independently of each other, on the necessary further development of the 110 kV network. The urban development in the Erfurt-Nordost area, the beginning ramp-up of the traffic turnaround (electromobility) and a strong demand for high connection services for the settlement and operation of feed-in generation systems in the supply area lead to a significant increase in the projected total connection capacity. Depending on the height and arrangement of the grid area, these influencing variables result in a considerable need for adaptation in the structure and dimensioning of the high-voltage grid. The subject of this invitation to tender is therefore the preparation and implementation of planning services (electrical planning: Primary and secondary planning, construction supervision) based on the basic services of the service phases 2 to 9 of the technical equipment (installation group 4 (power plants)) for the construction of a substation at the Erfurt-Stotternheim site. Specific information on the scope of the planning can be found in the task. The award is to be completed at the beginning of Q4 2026. The planning and associated measures must then be started immediately after the order has been placed (approximately the beginning of November 2026).

Submission Method
Electronic via:
https://www.subreport.de/E28126134
Tenders may be submitted
Electronic submission: required
https://www.subreport.de/E28126134
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
In diesem Kriterium wird die Reaktionszeit zum Erreichen der Baustelle bewertet. Gewichtung: 10 %
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.