-
Awarded20/03/2025
-
Today26/04/2025
Utilities
- indicates text translated automatically in your browsing language
25FEI78913 Vst Bischheim-Gersdorf, Renovation of the platform Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
A renewal of the existing platform is planned for the Bischheim-Gersdorf traffic station. The existing outer platform to the left of the single-track, non-electrified 6200 line is to be renewed over a length of 170 m. The beginning of the platform is at km 7.2+40.768 and the end of the platform is at km 7.4+10.883. The length is 11.5 cm longer than 170,000 m, so that complete platform edge prefabricated parts can be used. The required joints and expansion joints between the finished parts are taken into account. The current height of 20 cm above sea level. SO should be at a control height of 55 cm above sea level. That's how it's raised. In the course of the new construction, inactive platform systems are to be dismantled as partial dismantling and kept as expansion reserve. Proper adaptation of the areas must be carried out. The construction standards and the equipment manual and catalogue of DB InfraGO AG (former DB Station&Service AG) for station category 6 are used as the basis for planning. Period of performance: 05/2025 - 03/2026 Text automatically translated in your browsing language Automatically translated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.