Germany-Aschheim: Boiler installations
Supply, installation and commissioning of a direct light LiBr absorption heat pump (AWP) with 5 MW useful heat output for use with natural gas. The following services are to be provided by the AWP: Cooling capacity: approx. 2 000 kW, alternator power: approx. 3 000 kW, total heating capacity: approx. 5 000 kW.
The absorption heat pump is to be integrated into a district heating system. The operation of the AWP is planned at the following temperatures of the district heating network.
Low-temperature source: Admission: 55 °C, outlet: 48 °C;
Useful heat output: Admission: 55 °C, outlet: 80 °C (target flow temperature).
The AWP must bear a CE marking in accordance with EU Regulation 765/2008, whereby the manufacturer confirms that the product complies with the applicable EU directives specific to the product.
The scope of supply and assembly includes, inter alia, the gas control line. Further connections to the AWP are being built.
42160000 - Boiler installations
45200000 - Works for complete or part construction and civil engineering work
Postal address: Gublenstraße 1
Town: Eschenbach
Postal code: 8733
Country: CHE
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.