-
Published13/01/2025
-
Deadline11/02/2025
-
Opening of tenders11/02/2025
-
Today27/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
FCC New Building - Metal Construction II Text automatically translated in your browsing language Automatically translated
The building plot is located on the campus of the GSI Institute for Heavy Ion Research GmbH at Planckstraße 1 in 64291 Darmstadt. The area of the future FCC is declared in the development plan Wx 12, Arheilgen district, corridor 24 as special area SO 1.2 with a maximum height of the planned construction of 154 m above sea level. The main services listed below are indoors on levels 01 to 05, ground floor to 4. Upstairs to execute. The contractor must provide and carry out the following services with these documents: - Aluminium/glass tubular frame doors with fire protection requirements RS and T30-RS - Sliding escape route doors with lock function - Internal posts Latch-Glast partition wall with requirements RC4 and sound insulation 47dB as well as integrated electrically switchable glazing - Sheet steel doors - Steel folding sliding door Further details can be found in the specifications and the procurement documents. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXS0YYEYTDVLNJNU
https://www.dtvp.de/Satellite/notice/CXS0YYEYTDVLNJNU
45421100 - Installation of doors and windows and related components
45421131 - Installation of doors
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.