KNARVIK SEWAGE TREATMENT PLANT, KNARA E2 CONSTRUCTION CONTRACT
Alver municipality in Vestland shall establish a new treatment facility for treatment of sewage water from Knarvik and nearby areas. The facility shall be established at Kvassneset in Knarvik and it is close to Kvassnesstemma and a hiking area around it. In addition to the erection of the sewage treatment facility with personnel buildings, this contract also deals with the construction of structural works with a sewage pump station and an access road thereof. The construction contract (this contract) concerns (not exhaustive list): • Preparation of the site • Complete construction work for the buildings • Delivery and assembly of a gantry crane, facilitating use in the assembly phase • Construction auxiliary work for the machine contract • HVAC for the entire contract, including odour removal installations • Electrical work for the entire contract including solar panel installations • Establishment of 10 ground heat wells with a depth of approx. 300 metres each • Exit from Kvassnesvegen and road to the plant, temporary construction road in route for a water and sewage ditch between the treatment facility and down to the existing foot/cycle path in the south as well as a permanent access road to the sewage pump station. • Complete water and sewage works with water, storm water and wastewater pipelines including pump pipeline • Establish two emission pipelines in sea to cote -60 in Osterfjorden • Concrete bridge over stream on access road to the sewage pump station • Establishment of activity tracks and a waiting place facilitated for longer stays with a campfire place and gapahuk with benches • Establishment of a universally designed ramp that slings up between the trees to a viewing platform at the southern end of the building and that connects the facility to the existing footpath around Kvassnestemma • Provide joint rigging and operational services for other co-ordinated contracts in the project • Performs the role as a main company in accordance with the Working Environment Act § 2-2 and the Internal Control Regulations § 6 with responsibility for co-ordination of the individual companies ́ health, environment and safety work • Responsibility for coordination and progress control of co-ordinated contracts.
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=440807&B=
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=440807&B=
45315100 - Electrical engineering installation works
45315000 - Electrical installation work of heating and other electrical building-equipment
45316000 - Installation work of illumination and signalling systems
45315300 - Electricity supply installations
45312000 - Alarm system and antenna installation work
45310000 - Electrical installation work
45332000 - Plumbing and drain-laying work
45331000 - Heating, ventilation and air-conditioning installation work
45232400 - Sewer construction work
45232000 - Ancillary works for pipelines and cables
45233000 - Construction, foundation and surface works for highways, roads
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.