-
Published22/08/2025
-
Deadline10/09/2025
-
Today10/06/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Bridge - Decoupling Building - TI SPDC
The Technicentre de Saint Pierre des Corps will welcome new railway trains in mid-life operations from 2026. These trains will have to be uncoupled and roof disconnections are necessary. This operation will be carried out in a new building (Uncoupling Building) which will have to be equipped with a walkway allowing safe access to the roof. Acquisition, delivery, installation and commissioning: - A working walkway approximately 42 m long, 36 m of which are equipped with a sliding drawer and 3.75 m high. - Lifeline support structure(s) and two person fall barriers - A 3.75m high technical platform for the TGBT and Réseau cabinets.
https://sncf.bravosolution.com/web/login.html
https://sncf.bravosolution.com/web/login.html
44210000 - Structures and parts of structures
45200000 - Works for complete or part construction and civil engineering work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.